Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / on Product Reliability / Apex Ridge / The “Mid-Life Crisis” Use-Case

by Adam Bahret Leave a Comment

The “Mid-Life Crisis” Use-Case

The “Mid-Life Crisis” Use-Case

When a product has broad usage profiles how do you create one for a test protocol.  Do you select the easiest?  Obviously not because there is risk of a high failure rate from poor evaluation.  Do you select the hardest use-case?  You could but there is the risk you spend too much time and money making the product overly robust for most of your customers.

In these cases where test time is limited and only a single use case can be tested I create a “Composite” use-case.  It captures many of the different types of stresses from the full list of use-cases but keeps an accumulated stress on the design that represents at least 98% of the customers.

Let’s say I have to create a use-case for test for a new vehicle.  All driver types have been characterized for factors like driving duration, start stops, aggressive acceleration and braking.

  • Use Case 1: We have the “Old lady” use-case. Does low mileage, accelerates and brakes very carefully.  Sometimes doesn’t get used for days because she forgot where she parked it and takes the bus home.
  • Use Case 2:  “Punk Ass kid”, parents bought him the car.  He has no respect for the vehicle, wants to impress his friends and his brain is completely pickled by hormones. This menace to society does burn-outs, prides himself on doubling the speed limit, has to slam on the brakes to not hit just about everything.  Didn’t know you are supposed to do oil changes and will drive across three states on a Friday night just because his best friends cousin said he will buy them beer and he knows some college girls.
  • Use Case 3:  “Soccer Mom”, does some highway driving, does some city driving. 10k mile a year, sticks to the maintenance schedule mostly because the waiting room has windows into the garage and you can watch the “mechanics” work.  “Take it easy there 50 Shades”

So what is the reliability test use-case that should be used?

I would be comfortable making reliability statements on what we can call “The mid life crisis” use-case.  It’s a 50 year old dude who finally bought that Mustang he always wanted.  He mostly drives it to work on the highway, does start/stop driving when he has to drop off and pick up the kids, meets up with his buddies on Saturday’s and does a burn-out when he leaves their house because he now has to put sunscreen on his head when he mows the yard.

That use-case probably has the range of stresses that cover over 98% of the vehicle owners but won’t drive design changes that make the product overly robust or late time to market.

A piece of advice: Read the room first if you plan to use this example when making a “use-case” pitch in a meeting.

-Adam

Filed Under: Apex Ridge, Articles, on Product Reliability

About Adam Bahret

I am a Reliability engineer with over 20 years of experience in mechanical and electrical systems in many industries. I founded Apex Ridge Reliability as a firm to assist technology companies with the critical reliability steps in their product development programs and organizational culture.

« Equipment Reliability Depends On Understanding Failure Modes!
Wicked Problems »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Adam Bahret
in the Apex Ridge series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy