Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / on Product Reliability / Apex Ridge / Maybe we can fall in love again

by Adam Bahret Leave a Comment

Maybe we can fall in love again

Maybe we can fall in love again

We’ll the boat saga continues.  As I shared she has turned out to be a cruel mistress.  Enticing and a thrill at times and then without warnign I get the cold shoulder.   So I am going to take a well known reliability strategy with her.  Hopefully we can just be in love again with all of our interactions being nothing but bliss.  it’s the oldest reliability trick in the book. “Less is More”  The less parts you have the less there is to break.

The more I have gone through this fuel injection system the more amazed I am it has worked this long.  The main power relays on the motor are automotive i.e. not for a very wet and humid application. Then !!!(this is infuriating) they are mounted upside down so the seams for the protective cover are on top. This is a boat motor compartment.  It has water in the bottom that get’s heated up when the motor runs. Then cools off, condensates after use.  Over and over again.  That is basically a humidity cycling chamber.

So the plan?  I really don’t feel like adapting a whole modern fuel injection system to this motor.  It’s a pleasure craft and not an engineering thesis.  I have my car projects and customer projects for that fun.  So it is going to be rip out the entire fuel injection and ignition system. This will replace the entire computer controlled ignition system with a distributor that has a built in coil.  It will have two wire connections to the main power system, that’s it.  This replaces about 14 electrical connections for the computer controlled ignition.  After I gleefully ripping out the fuel injection system I will put in a modern design carburetor.  This will have zero electrical connections.  yes zero!  The only two possible ones would be an electric choke and an electric fuel pump.  I don’t need a choke because I can pump the throttle twice before starting and a mechanical fuel pump driven by the cam shaft is fine by me.  This will replace…wait for it…wait for it… 78 electrical corrections.  Correction… 78 automotive not really intended for a water application 20 year old connections.

So from an electrical reliability standpoint I just took 92 potential failure points and reduced it to 2.

Maybe I’ll take her to Paris in the Fall

-Adam

Filed Under: Apex Ridge, Articles, on Product Reliability

About Adam Bahret

I am a Reliability engineer with over 20 years of experience in mechanical and electrical systems in many industries. I founded Apex Ridge Reliability as a firm to assist technology companies with the critical reliability steps in their product development programs and organizational culture.

« Sample Size – Measuring a Continuous Variable
Lessons from Scrum for Opportunity Champions »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Adam Bahret
in the Apex Ridge series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy