Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Maintenance and Reliability Maturity – 2

by James Reyes-Picknell Leave a Comment

Maintenance and Reliability Maturity – 2

Maintenance and Reliability Maturity – 2

In part 1 of this 2 part series, “Maintenance and Reliability Maturity”, I point out that achieving the maximum value from your physical assets will require excellence in 2 main dimensions, efficiency, and effectiveness. Those are described more fully in our recent book, “Paying Your Way“. I also promised a Maintenance and Reliability Maturity Assessment tool. That tool is now available to you, our readers.

The link below will take you to a web page that is only accessible via the link – it is not included in our website’s menus or other links. When you click on it, you will see a brief explanation of how to use it and then a series of 10 questions, 5 on efficiency, and 5 on effectiveness. In a few of them we use terms that have precise definitions, so please read those definitions (in light blue boxes) before entering your answers to the questions in the light green answer cells.

When completed, your responses produce a single point mapped on a 2-dimensional grid with colors similar to the above figure. Like the figure above, efficiency is on the vertical scale, effectiveness is horizontal. The colors are more gradual than above moving from deep red to orange, yellow, light green, medium green, and dark green. The further to the upper right you are, the more value you are getting from your physical assets.

Each block on the plot has a brief explanation and each color code has a more general interpretation of the results.

This exercise is not about how well you are doing in maintenance and reliability as it may seem, it is really all about determining how much value opportunity you may achieve by improving on them. If you want to know what to work on, then you can also do our “Uptime Maintenance Excellence Self-Assessment” that is coming soon. Watch this space.

Link to Maintenance and Reliability Assessment

Soon we will be adding an online business case estimator tool. It will combine that M&R Assessment with a few additional pieces of data needed to determine cost savings and output potential. 

We also have an “Uptime Maintenance Excellence” maturity assessment included as an assignment within our “Uptime – Strategies for Excellence in Maintenance Management” course. 

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« Help! They Lost the Data
Schedule Risk is a Major Reason for Project Failures »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy