Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Machine Run-Off’s: What Are They and Why Do Them

by Ray Harkins Leave a Comment

Machine Run-Off’s: What Are They and Why Do Them

Machine Run-Off’s: What Are They and Why Do Them

A machine run-off, refers to the process of testing and adjusting a new or modified machine or piece of equipment before it is put into regular use. When a run-off is performed prior to shipping to the customer, it is called a Factory Acceptance Test (FAT), and when it is performed after installation at the customer’s facility it is called a Site Acceptance Test (SAT). 

Both types of machine run-offs are common with large, complex, and/or expensive equipment. And both have the same goal of ensuring the equipment is safe and reliable, and meets the customer’s requirements and functional criteria before it is launched into production where repairs and corrections become much more expensive. The SAT is largely a repeat of the FAT expect it additionally verifies that no damage was incurred during shipment and that the unit is correctly installed.

Run offs typically involve cycling the machine through a series of tests to ensure that it is functioning properly and that any issues or problems have been identified and addressed. 

The SAT and FAT, despite their singular nouns, are comprised multiple tests to verify different performance aspects of the machine. A common first step in an acceptance test is a visual inspection of the components of the machine as compared to the purchase order and engineering specifications. This includes:

  • All components and accessories.
  • Correct input power connection (e.g. electrical, pneumatic, hydraulic, etc.)
  • Safety curtains, static guarding, interlocks, etc.
  • Custom or perishable tooling
  • Documentation such as operating manuals, prints, electrical schematics, and spare parts list

Next is a start up of the equipment. Depending on the complexity of the equipment, this and subsequent steps may be interleaved with training for the customer’s representative. Helpful observations during start-up may include correct air or hydraulic pressure, unusual noise or vibrations, and the correct functioning of control screens.

Then after the initial start-up but before any parts are manufactured, FAT’s include a safety validation test. This is where all light curtains are intentionally breached, e-stop buttons are pressed, 2-hand controls and similar safety devices are intentionally activated to determine if they are correctly functioning. A failure at this step results in a failure of the entire acceptance test.

Once the equipment is verified to operate safely, factory technicians will begin a production run of the customers parts. In the case of a CNC lathe for instance, technicians will set up the machine with the customer’s raw inputs and cut their shapes to their specification. This will give both factory and customer representative the opportunity to observe the machine in motion. These sessions may be video recorded for future reference.

At this point, a second test may take place: functional performance. Commonly machines are specified with a minimum production rate. This may include a cycle time such as “less than 3 seconds per part” or a longer-term rate such as “minimum 3,500 parts in a 4-hour run”. This latter test is designed to account for perishable tooling changes, minor process adjustments, the resolution of machine faults, and similar. By conducting a longer functional test, customers may observe certain types of shifts or failures that are less likely to occur in shorter events.

A third area of evaluation is quality performance. Once the machine is functioning at its production rate, a quality representative may select samples for process capability analysis. In short, a process capability study is an analytical comparison of the customer’s specification range for a given part characteristic (typically a critical-to-quality characteristic) and a statistical-derived estimation of the process range for that characteristic based on a sample of parts produced by the machine.

Common process capability studies for machine run-offs include:

  • Cpk – An analysis of the potential quality performance of the machine performed by comparing the average variation of small subgroups over time to the customer’s specifications. 
  • Ppk – An analysis of the actual quality performance of the machine performed by comparing the total variation of parts it produces over time to the customer’s specifications.
  • Cmk – An analysis of a narrow range of sequentially produced parts to find the machine’s minimum inherent quality performance as compared to the customer’s specifications.

And for machines with integrated measurement systems, another type of statistical analysis called a Measurement Systems Analysis may be performed as well.

A well-conducted machine run-off will also include the documentation of all significant findings, both positive and negative, including a checklist of action items that need completed prior to full acceptance by the customer.

And while not a formal part of FAT’s and SAT’s, they are often a good opportunity for the formal training of machine operators, set-up technicians, engineers, and maintenance personnel.

FAT’s and SAT’s are beneficial not just for the equipment buyer, but for the manufacturer as well. A well-planned and executed acceptance test can help both parties understand that the contractual requirements have been met, and that the equipment can operate safely and reliably in the customer’s facility. Identifying and correcting even small issues discovered during acceptance testing can save untold time, onsite repair costs, and the frustration of not meeting the expectations of the project.

[display_form id=362]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

About Ray Harkins

Ray Harkins is a senior manufacturing professional with over 25 years of experience in manufacturing engineering, quality management, and business analysis.

During his career, he has toured hundreds of manufacturing facilities and worked with leading industry professionals throughout North America and Japan.

« Maintenance Interval Optimization – Identifying the best Maintenance Strategy
Case Study in Tolerance Design of a Spring using Monte Carlo Simulation »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Logo for The Manufacturing Acadamey headshot of RayArticle by Ray Harkins
in the The Manufacturing Academy article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy