Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / The Low Bid: Who’s Risk?

by Greg Hutchins Leave a Comment

The Low Bid: Who’s Risk?

The Low Bid: Who’s Risk?

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The Low Bid: Who’s Risk?

We live in a competitive environment and business generates the money that makes the world go round, or at least should do.  Money is the medium of exchange for goods and services and allows society as we know it and the global economy to function.

Those who have money engage those who want money to provide them with products or services and this is done through contracts.  Contracts are awarded at a price that the person who has the money (the Client) is prepared to pay and ‘the winner’ is typically the lowest compliant bid.

If compliance isn’t met then there is suffering somewhere. It can be the Client, the Bidder, the end user or all three and on Government projects it’s the taxpayer who, inevitably, pays.

The Risk

The end users suffer if contracts aren’t met.  As an extreme case, the astronaut John Glenn (1921 – 2016) exemplified this when he said:

As I hurtled through space, one thought kept crossing my mind – every part of this rocket was supplied by the lowest bidder…

In a more down-to-earth setting the end-user may think along similar lines when there are power cuts, water shortages, garbage pile ups, traffic disruptions, rail and airport delays and accidents.

The Cause

So, why would a bidder put in a low bid…is it:

  • a ‘loss lead’ to nurture a future relationship.
  • a plain mistake and a failure to price the job correctly.
  • a vane attempt to increase turnover without the sanity of profit.
  • desperation to keep the company afloat.
  • an effort to look good while underbidding and eradicating the competition

No matter what the reason, if the low bid is compliant and it’s accepted, it’s everybody’s risk.

The Consequences

For the Client, he is left with a reneging supplier and is then obliged to terminate the contract or possibly pay more.  The supplier may be forced into liquidation and cease to exist as a business entity.  The end-user isn’t supplied.

The consequences were summed up in an eloquent manner by John Ruskin in the 19thCentury when he said:

If you deal with the lowest bidder, it is well to add something for the risk you run, and if you do that you will have enough to pay for something better…

For the supplier who has the low bid and operates at a loss his business may fail. In the paraphrased words of Dickens’ Mr Micawber it’s a fine line between misery and happiness:

“Income $20.00, Expenditure $19.99 cents: result, happiness. Income $20.00, Expenditure $20.01: result, misery.”

And for the end users who may think that the low bid is a bargain we should remind ourselves of Benjamin Franklin’s sagely observation some two hundred years ago:

“The bitterness of poor quality remains long after the sweetness of low price is forgotten”.

However the consequences can reach much further when the low bidder eventually realises there is a problem and the supply chain is affected.  Somebody, somewhere, may gamble on providing things cheaper and a downward spiral of undercutting develops.  But, as the problem grows and people strive to keep their business afloat they will, like the proverbial drowning man, clutch at straws.

Mitigation

Clients should be prudent about the apparent bargain that lands at their feet and consider the consequences that can ensue if it is accepted.  “Never look a gift horse in the mouth” is true but the ‘low bid’ is business, not a gift.

The low bid may have to be accepted because of financial rules that may demand that the lowest compliant bid is acceptable.  In these circumstances it’s a self imposed problem as Finance Officers do their job by rote resulting in satisfactory underperformance and plausible deniability as the “rules” are followed blindly.

On the other hand, there is the opportunity to accept a more realistic bid, exercise caution and then decide upon a sustainable solution.

Reality

A low bid represents a risk so why, with our risk management skills, do we choose the low bid.  It should not be about the ‘bargain’, it should be about prudence.

For the Client it’s caveat emptor but for the low bidder it’s caveat venditor…

Bio:

MBA, MSc DIC, BSc; Chartered Engineer, Chartered Geologist, PMP

Over thirty years’ experience on large multidisciplinary infrastructure projects including rail, metro systems, airports, roads, marine works and reclamation, hydropower, tunnels and underground excavations.

Project management; design & construction management; and contract administrative in all project phases from feasibility, planning & design, procurement, implementation, execution and completion on Engineer’s Design and Design & Build schemes.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Are We There Yet?
Wrecking a Mature PdM Program »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy