Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / LNG Regasification Facilities: Consider High Pressure Releases

by Sanjeev Saraf Leave a Comment

LNG Regasification Facilities: Consider High Pressure Releases

LNG Regasification Facilities: Consider High Pressure Releases

LNG import terminals in the U.S. follow NFPA-59A and 49CFR193 standards for facility siting.  As a part of the siting studies, LNG regasification facilities report thermal radiation exclusion zones and flammable vapor exclusion zones:

  • Flammable vapor hazard zones are based on a design spill from a single accidental source, usually a guillotine rupture.
  • Thermal radiation hazards are based on tank fire.

These events used for determining exclusion zones, pipe rupture and tank fire, have a low probability.  Surprisingly, the current standards have no requirements to model consequences from high-pressure LNG releases which are more likely.  Furthermore, the current codes do not reference Vapor Cloud Explosions (VCE) which directly affects plant layout and siting.

There is high-pressure processing equipment in LNG import and export terminals (e.g. vaporizers in LNG import terminals) that can result in aerosolized release of LNG and can potentially lead to an explosion.  Therefore, in addition to the consequence modeling performed for code compliance, facilities must model high pressure releases and VCEs for:

  • Optimizing plant layout
  • Deciding risk mitigation measures, and
  • Terminal/building siting

I discuss issues related to high-pressure releases in a recently presented paper at AIChE conference in Florida.
Sanjeev Saraf, Subodh Medhekar, and En-Hua Yang, “Have You Considered High-Pressure LNG Releases? They Are More Likely Than Catastrophic Failures”.

AIChE members can view the recorded presentation at the following URL:
http://aiche.confex.com/aiche/s09/webprogram/Paper145131.html

If you need further information, please feel free to contact me.

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

About Sanjeev Saraf

Reduce risks, Increase Uptime, Reduce costs

I did my first litigation support work in 2000.

Since then I have been obsessed with preventing future failures. Some of these failures can have catastrophic consequences.

Having tried various techniques, learning / unlearning “latest” paradigms, it is clear we have a long way to go!

But instead of thoughtful work, what I mostly see are platitudes and oversimplifications. No keen practical insights!

I want to change that.

« What Are Broken Parts Trying to Tell Us?
Facilitation Skill # 8 – Brainstorming »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Photo of Sanjeev SarafArticles by Sanjeev Saraf
in the Operational Risk, Process Safety article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy