Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Life Cycle Cost Analysis and Reliability

by Fred Schenkelberg 2 Comments

Life Cycle Cost Analysis and Reliability

Life Cycle Cost Analysis and Reliability

The purchase price of a product may be the start of the cost of ownership.

Maintenance and repairs may cost many times the initial purchase price. An efficient maintenance process and low-cost spare parts may help minimize cost, yet a design that optimizes the total cost of ownership is the most effective method.

Consider a simple example, a ball point pen.

Let’s say it cost $100 to purchase. It is comfortable to hold, writes very well, and is stylish. If the replacement ink cartridge cost $5 and last a couple of years of daily use that would be a reasonable life cycle cost experience. On the other hand, if the cartridge cost $50 and lasted only a month I may want to find a new pen soon.

There are many other elements to the lifecycle cost including:

  • Manufacturing costs
  • Purchase price
  • Transportation costs
  • Installation costs
  • Start up costs
  • Training costs
  • Maintenance costs
  • Repair/Spares costs
  • Replacement/Warranty Costs
  • Decommissioning costs
  • Recycling costs

Each cost, including initial purchase price, is to some extent controlled by the design. Depending on the product and the agreement with the customer the costs may be incurred by the customer or shared between the manufacturer and customer. The total cost, in part, influences the customer expectations and satisfaction.

For complex systems, system engineering teams address each of the elements of the life cycle and include reliability analysis as necessary. For simpler systems, the burden falls to the design and development teams. In either case, the ability to estimate the durability of components and systems allows the design team to make appropriate design decisions that will minimize total cost of ownership.

In some cases, the design team may balance the cost of shipping a heavier product that will survive longer with the cost of maintenance of a lighter overall product.

Summary

As you may imagine, there are many possible tradeoffs that permit minimizing life cycle costs. When these costs are estimated and considered during the design process, the ability of the team to optimize life cycle costs increases.

Filed Under: Articles, CRE Preparation Notes, Reliability Management Tagged With: Product development, Product life cycle

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Duration and Reliability Goals
Confounded DOE »

Comments

  1. Kevin stewart says

    May 28, 2017 at 6:35 AM

    When all costs are considered and and converted to “net present value” then you can make a decision

    Reply
  2. Hilaire Perera says

    April 26, 2019 at 11:54 AM

    Cost Benefit Analysis (CBA) is an economic analysis that basically compares the Life Cycle Costs (LCC) of the system with and without the warranty to determine if warranty coverage will improve the LCC. Sufficient time must be allowed for preparation of a warranty CBA since detailed work is required for accomplishment. CBAs should be initiated as soon as the cost data is available.

    Sensitivity analysis may also be performed to see the effects of changes to program parameters on warranty cost effectiveness. These parameters may be length of the warranty, system activation schedules, projected utilization rates, repair turnaround times, or system performance elements

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy