Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Lack of An ERM Policy is Risky

by Greg Hutchins 2 Comments

Lack of An ERM Policy is Risky

Lack of An ERM Policy is Risky

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Lack of An ERM Policy is Risky

Background

A defense company I worked for wanted to get into the Sonobuoy business. At the time, one company dominated the market and usually received the largest share of the Navy contract.  A couple of other suppliers got the balance of the production quantity to keep it a competitive business.

My company developed a win strategy based on a ¼ scale prototype and purposely under bidding the competition. It worked. They won the largest piece of the production contract.

Design and First Article Fabrication Phase

Upon receipt of the contract, an “A” team was established and given whatever staff and assets they needed to succeed.  A Sonabuoy is a difficult challenge to produce in quantity for a winning price. It must take the force upon deployment from an aircraft, the parachute must deploy, it must send a message upon entering the water, and it must scuttle itself (sink) and can only cost around $500 a unit. It is a difficult task to accomplish especially the first time around.

The design and First Article fabrication phases went per plan.   The Contract required 5 First Article units fabricated to the production procedures and materials to undergo qualification tests prior to approval by the Navy for production.

First Article Qualification Tests

The qualifications phase went very badly. All 5 units failed the qualification tests. The failures were due to a random number of poor design and fabrication issues.  An in-depth FRACAS (failure reporting analysis and corrective action system) process was executed. Redesign and fabrication of 5 more units were performed and the units put back into the qualification tests. Again, all five units failed to pass. The FRACAS process showed new design and fabrication issues.  The effort to pass qualification tests went on for over a year but with poor results. Evidently, the design was not robust or reliable. The fixes put into place during the testing were band aids. A major redesign was required to pass the qualification tests.

What to Do

The company had invested 2 years and millions of dollars up to this point.  It seemed futile to continue unless a major re-design, schedule time, and a significant additional cost overrun took place.  Since it was a Navy contract, the company could not just default on it. Based on the Navy’s recommendation, my company novated their contract to another DOD company. It came at great expense because to accept the contract the other company wanted millions of dollars and technical support for 1 year. My company agreed to the deal and completed the novation of the contract to the other company.

The other company was finally successful at completing the First Article qualification tests but could only achieve a very low yield in delivering the production units. They lost a lot of money on the novated contract.

Lesson Learned

  1. Robustness and reliability are designed into a product. This was not the case with the scale model prototype. Furthermore, the baseline plan did not include schedule time and budget to include it in the First Article unit. Adding band aids later is not a good solution.
  2. It is difficult to take a scale model to a full up production unit. Again, schedule time and budget should have been included in the baseline plan to build a prototype and test it before going directly to the First Article unit.
  3. The strategy employed by my company was too aggressive. A better one may have been to design, fabricate and test multiple units using company money to gain experience with the product. Then, to bid only on the smaller quantities before going for the largest production contract.
  4. Establish a ERM system to protect the enterprise on any contract bid. My company did not have such a system.

Risk Analysis

If my company had a ERM in place and assuming they employed it correctly, they would have saved face and reputation (novating a contract does not sit well with the government) and most likely made a profit.  The ERM process may have concluded it was too risky to go for the gold ring first time around and defined a less aggressive strategy.  But assuming they wanted to take the higher risk and go for the big prize, the ERM process most likely they would have identified the following mitigating actions or similar ones:

  1. Build a scale model prototype to provide test data and design capability in the proposal to demonstrate to the customer you are a viable candidate supplier. But recognize, the scale model is only that and it has short comings. The RFP (request for proposal) usually allows 60 days to submit your proposal which means the company has to invest their own money to be ready for it. That is why a scale model makes sense to minimize investment in case you do not get a contract.
  2. Include time and budget in the baseline plan to conduct a new design of a full up unit with robustness and reliability designed into the product. Also include, time and budget build and test multiple prototypes including redesign to include test lesson learned.
  3. Conduct a very thorough and comprehensive risk analysis during the proposal prep phase. If the risk analysis is delayed until the contract is underway, then there will most likelyme be no budget or schedule time in the baseline plan to mitigate the risk. If the probability of a risk occurring is high and the impact (or consequence) is high, include the tasks and budget to mitigate the risk in the baseline budget. The risk register is for other identified risks. Include in the MR (management reserve) budget and schedule time (planning packages) for the factored risks.

Bio:

John earned a BS in Mechanical Engineering and MS in Engineering Management from Northeastern University. He has a total of 44 years’ experience, 30 years with DOD Companies. He is a member of PMI (project Management Institute). John has managed numerous firm fixed price and cost plus large high technical development programs worth in excessive of $100M. He has extensive subcontract management experience domestically and foreign. John has held a number of positions over his career including: Director of Programs; Director of Operations; Program Manager; Project Engineer; Engineering Manager; and Design Engineer.His technical design areas of experience include: radar; mobile tactical communication systems; cryogenics; electronic packaging; material handling; antennas; x-ray technology; underwater vehicles; welding; structural analysis; and thermal analysis. He has experience in the following areas: design; manufacturing; test; integration; selloff; subcontract management; contracts; risk and opportunity management; and quality control. John is a certified six sigma specialist, certified level 2 EVM (earned value management) specialist; certified CAM (cost control manager).

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Using pH meters
A Series of Unfortunate MTBF Assumptions »

Comments

  1. SPYROS VRACHNAS says

    February 27, 2018 at 8:29 AM

    Indeed lack of ERM Policy can be risky.
    But you do not necessarily have to have an ERM policy in order to design a robust and reliable product.
    You need experienced designers applying “reliability in design” tasks and capable manufacturing.

    Reply
    • greg says

      February 27, 2018 at 10:01 AM

      What you see depends on where you sit.

      Famous quotation.

      You’re right. Product level view does not require an enterprise point of view (POV) unless you’re an executive (VP and above)

      However, the enterprise POV is essential if you want the product design to be adopted, funded, marketed, and monetized.

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy