Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / KISS: A Principle for Proper Project Planning

by Greg Hutchins 3 Comments

KISS: A Principle for Proper Project Planning

KISS: A Principle for Proper Project Planning

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

KISS, “Keep It Simple, Stupid” is a US Navy principle from the 1960’s advocating that systems function best if they are kept simple rather than made complicated and that unnecessary complexity should be avoided.

In our politically correct world ‘stupid’ is often taken as an insult and ‘keep it short and simple’ or ‘small and simple’ is often substituted.  ‘Stupid’ is not an insult, it’s a warning!  It takes a bright person to keep things simple, particularly when it’s easier to have a complex mess under the guise of sophistication.  Projects inevitably become complicated as they develop which increases the risk of potential failings.

Keeping things simple can improve the chances of success and simplicity is best achieved during the project planning before execution takes place; or after wild enthusiasm has waned.

Simplicity is Not New

The KISS principle is not a 20th Century invention, advocates of simplicity have been around a long time:

  • Occam’s Razor of the 14th Century states “simpler hypotheses are generally better than the complex ones“
  • da Vinci in the 15th Century coined “Simplicity is the ultimate sophistication“
  • Shakespeare in the 16th Century advocated “Brevity is the soul of wit“

However, ‘oversimplifying’ is of little benefit and Einstein warned “Make everything as simple as possible, but not simpler”

Simplifying takes time, effort, application of experience, and possibly innovation.  And just as the quote “If I Had More Time, I Would Have Written a Shorter Letter” highlights the importance of brevity and editing in writing the same is true of management.  Projects formulated in deliberate simple terms allow for progressive development and elaboration around a robust and sustainable structure…’well begun is half done‘.

Complex can be a Simple Way

Projects include for many aspects that need to be managed.  Project Management institutions provided ‘Bodies of Knowledge’ addressing prescribed stages, recommended processes and knowledge areas.

The American PMI BoK has 47 processes and the British APM includes for 52 sections which can assist in formulating the ‘Project Management Plan’.  However it is up to the manager of the project to determine the Project Plan.  If an entire BoK is thrown at a project it will make for complexity at the outset.  Too little an application of a BoK will lead to oversimplification and Einstein’s words will then ring true.

Complexity can give the illusion that things are ‘better’ and a resultant voluminous Project Plan may impress some people.  Churchill’s observations that voluminous documents “bytheir very length defends themselves against the risk of being read” may have promoted his advocating of the one-page plan.  ‘Less’ will almost certainly mean ‘more’ while avoiding micromanagement and promoting initiative.

Keeping it Simple

“Why do we have project management?” is a simple question.  And the simple answer is “So that we know what to do, when, how, where, and by who(m)” as poetically captured by Kipling:

I keep six honest serving-men – (They taught me all I knew)

Their names are What and Why and When, And How and Where and Who.

Within this general framework a series of breakdown structures may be developed and elaborated upon as a project matures:

  • ‘what’ – Work Breakdown Structure (WBS)
  • ‘who’ and ‘where’ – Organisation Breakdown Structure (OBS) including project participants, stakeholders and communication channels
  • ‘when’ – Time Breakdown Structure (TBS)
  • ‘how much’ – Cost Breakdown Structure (CBS)
  • ‘how’ – Quality Breakdown Structure (QBS)

But let us not forget a RBS (Risk Breakdown Structure) addressing the ‘what ifs’ and allowing contingencies to be planned for in terms of quality, cost or time, or people.

These structures allow a PM to compartmentalise the myriad of elements that may be in his or her mind and allow all matters to be addressed systematically.  “A place for everything and everything has a place” is a quote worth remembering when formulating your Project Plan.

Simple is not Stupid

Presenting a plan simply should not be confused with ‘dumbing’ it down’; that is not the aim of KISS.

If a PM does not take the time to plan systematically and presents the Plan in a complex manner, then this is just plain stupid.  It takes time to make things as simple as possible and this is an art that can be learned.  Time spent planning is never wasted and communicating the plan continuously is essential; a simple structure helps.

Plans that are complex inevitably require time to be assimilated and understood.  If it’s not understood there will be ambiguousness, misunderstanding and potentially crisis, chaos, confusion and possible conflict leading to some degree of failure in some way.

Simple plans are not made by or for stupid people.  But failure to be systematic and simple will result in stupidity somewhere by somebody at sometime…stupid is as stupid does!

Bio:

UK Chartered Engineer & Chartered Geologist with over thirty-five years’ international experience in multicultural environments on large multidisciplinary infrastructure projects including rail, metro, hydro, airports, tunnels, roads and bridges. Skills include project management, contract administration & procurement, and design & construction management skills as Client, Consultant, and Contractor.

Provision of incisive, focused and effective technical and managerial solutions for all project phases; identifying and dealing with troubled projects, and leading project recovery and change through hands-on interaction.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Mechanical Level Sensor Types and Use
The P-F Curve Revisited »

Comments

  1. Marco says

    May 10, 2022 at 7:12 AM

    I believe Einstein would agree with this short and simple synthesis!

    Reply
    • Greg Hutchins says

      May 10, 2022 at 8:11 AM

      Yep. You’re right. If life were only so easy.

      Reply
  2. primavera p6 says

    June 11, 2022 at 10:05 PM

    Primavera P6 historically proves to be the superior option for construction management. through drastically reducing a project’s overall time and appropriately assigning resources.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy