Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / How to Estimate the Stochastic Performance of your Production System in 5 Minutes

by Andrew Kelleher 1 Comment

How to Estimate the Stochastic Performance of your Production System in 5 Minutes

How to Estimate the Stochastic Performance of your Production System in 5 Minutes

“Technical” reliability engineering is “quantitative”.  This implies that the benefits of improvement measures (e.g.: design changes or alternative maintenance strategies) can be quantified in terms of system performance parameters.  Refer, for example, Figure 1.

Chart, scatter chart

Description automatically generated
Figure 1: A comparison of the original design (A) and a proposed alternative design (B) in terms of production system performance parameters.

Notes to Figure 1:

  • Number of simulations: 100
  • Simulation time: 5 years
  • Unit (¤): an unspecified currency

It is evident from Figure 1 that the proposed alternative design (B) is superior in terms of the selected production system performance parameters.  The decision to implement the design change may be made based on the estimated benefits (refer Figure 1) alongside the required Capital Expenditure (CapEx).

The example above demonstrates that quantitative estimates of system performance are helpful for making good decisions, thereby ensuring that company resources are wisely invested.  The essential starting point, however, is a baseline estimate of the current (stochastic) production system performance.

Methods for estimating stochastic system performance

There are various methods of estimating the stochastic performance of the production system.  For example:

  • Top-down estimates based on historical production system performance.
  • Bottom-up estimates based on phenomenological asset models (refer Figure 1).

Whilst both methods (and combinations thereof) will find application, initial estimates are usually made based on available historical data.

This article demonstrates two simple approaches that may be used to estimate and visualize the stochastic system performance based on the fictious historical production data shown at Table 1.

Table 1: Fictitious historical production data.

YearProduction volume (kt)Production loss (kt)
201695.434.57
201794.305.70
201895.404.60
201991.818.19
202098.021.98

Note to Table 1: the Maximum Theoretical Capacity (assuming zero losses), or MTC, is 100 kt per annum.

Method 1: Empirical Cumulative Density Function (CDF) of production volumes

The empirical CDF shown at Figure 2 was plotted based on the historical production data at Table 1 using R.  R is a freely available language and environment for statistical computing and graphics which provides a wide variety of statistical and graphical techniques.  RAMS Mentat GmbH has developed a user-friendly interface for conducting Life Data Analysis (LDA) using R.

Chart

Description automatically generated
Figure 2: Empirical CDF of historical production volume.

The empirical CDF at Figure 2 may be interpreted (alongside the data at Table 1), for example, as follows:

  • It is estimated that annual production will be less than 95.43 kt with a probability of 75 %.
  • It is estimated that annual production will be less than 94.3 kt with a probability of 25 %.

In this case, the five data points have resulted in a very “blocky” CDF.  There are, of course, alternative methods for making more precise estimates of system performance.  Nonetheless, the CDF provides, for example, a good basis for determining the probability that next year’s production target can be met!

Since no statistical parameters are estimated using this method, the empirical CDF cannot be used directly for modeling.  However, it provides a valuable opportunity to compare model estimates with the historical reality, i.e.: a very valuable high-level model plausibility check.

Method 2: Weibull analysis of production losses

The Weibull probability plot of production losses shown at Figure 3 was plotted based on the historical production loss data at Table 1 using R via the RAMS Mentat GmbH “Life Data Analysis” (LDA) tool.

Chart

Description automatically generated
Figure 3: Weibull probability plot of production losses.

The probability plot at Figure 3 may be interpreted, for example, as follows:

  • It is estimated that annual production losses will be less than 5 kt with a probability of 50 %.
  • It is estimated that annual production losses will be less than 2 kt with a probability of 6 %.

The Weibull probability plot enables the characteristic parameters of the Weibull distribution to be estimated (Beta = 2.736, Eta = 5.64).  These parameters may be directly utilized to create a high-level model of the production system.

It is noted that the five data points have resulted in relatively broad confidence intervals.  More detailed data analysis (e.g.: based on data describing individual loss events) and modeling will enable the confidence intervals to be significantly tightened.

Summary

The first – and arguably most important – step in technical reliability engineering is to establish a quantified estimate of the current system performance.

This article has demonstrated that initial estimates of stochastic system performance are possible within minutes.  Further, it has been shown that the baseline system performance estimate provides:

  • A means of estimating the probability with which agreed production targets can be fulfilled.
  • A basis for estimating the business case associated with proposed improvement measures.

RAMS Mentat GmbH has developed an innovate technical and systems engineering approach – and supporting tools – that enables the reliability and safety performance of an entire production system to be optimized with consideration of capital investment, operational and maintenance cost constraints.

Filed Under: Articles, on Maintenance Reliability, Process Plant Reliability Engineering

About Andrew Kelleher

Andrew Kelleher is a Materials and Systems Reliability Engineer with many years of industrial experience (1999 to 2021) in diverse fields of safety and reliability engineering at renowned companies in Australia, England, and Germany, including: The Welding Institute, ExxonMobil, QinetiQ Aerostructures, Bayer and Covestro.

« People Forget to be Afraid
Lognormal Probability Plots »

Comments

  1. Dr. S.M.Aqil Burney aqil.burney says

    January 23, 2022 at 11:06 PM

    Nice work but I have done extensive simulation and modelling using https://onlinelibrary.wiley.com/doi/book/10.1002/9780470316726
    using the book of Ripley and I have worked under his supervion .
    However using R one can do stochasti /Monte Carlo simulation :
    https://www.probabilitycourse.com/chapter13/Chapter_13.pdf
    And also I have written a short communucation :https://www.researchgate.net/publication/321012979_SIMULATION_OF_SYSTEMS

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Headshot of Andrew KelleherArticles by Andrew Kelleher
in the Process Plant Reliability Engineering article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy