Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Gluing Plastic Pipes so You Can Trust Them

by Mike Sondalini Leave a Comment

Gluing Plastic Pipes so You Can Trust Them

Gluing Plastic Pipes so You Can Trust Them

What you will learn from this article.

  • Glued plastic pipes must have the joints prepared before gluing.
  • Some plastic is joined with glue while others are solvent joined.
  • Glued joints do not bond with the plastic but must be ‘hooked’ to it.
  • Install thrust brackets if large glued pipes change direction sharply.

Some plastics can be joined with glues or cements. One of the most common of these is PVC. PVC can be either unplasticised (uPVC) or chlorinated (cPVC). Some plastics can be dissolved and chemically bonded together. ABS plastic is such a plastic.

Glued Pipe End Preparation 

Glued plastic pipes come as a socket and spigot design. This means that the pipe slips into a recessed fitting. The glue is an adhesive that sits on the plastic surface but does not bond to the plastic. The strength of the joint depends on how much glue sticks to the plastic. The strongest joints are those what have:

  • a big surface area of contact between the pipe and the socket
  • are mechanically hooked to the plastic
  • the glue fully coating both surfaces.

To get excellent glued plastic joints it is necessary to use fine sandpaper to scratch the ends of the pipe and the inside of the socket for a distance equal to the full length of the socket. The fine scratches are made square to the axis around the circumference. When the plastic is sanded the scratches fill up with plastic fines and these must be removed to allow the glue to hook into the scratches. The fines in the scratches are removed with a suitable pre-cleaner available from the glue supplier.

The entire original manufactured surface must be removed by the sanding so that only a rough, matte finish is observable. It is not necessary to make deep scratches into the plastic. In fact if the scratches are too deep they will weaken the pipe by becoming stress raisers that will cause pipe failure. The scratches must be no more than 5% – 10% of the thickness of the pipe wall.

To help the glue coat the surfaces properly, dress the ends of the pipe with a 2 mm (1/16”) long 45o chamfer. This will spread the glue ahead of itself as it moves through the socket and also allow the glue to slide into the fine gap between the pipe and socket wall.

The glue is applied to both the pipe and the socket for a distance equal to the full length of the socket. The pipe end must be cut square to let the pipe slide the furthest distance possible into the socket. While the glue is wet the two parts are pushed home to the end of the socket and held together till the glue sets. Only by getting full surface area contact between socket and pipe can you be sure the joint will hold to its design requirements.

Solvent Joined Piping

ABS plastic joints are cut, roughened and cleaned in the same way as PVC joints. However instead of glue, ABS is joined with a solvent. The solvent dissolves the plastic surfaces in the socket and on the pipe and as it evaporates and dries the plastic molecules intertwine and set together.

The maximum possible contact surface area is necessary and the pipe must be pushed home to the bottom of the socket recess and held in place till the joint sets. Mechanically push the parts together if necessary. Design and built your own clamping devices.

Thrust Supports on Glued Pipes

When large diameter glued plastic pipes are used it is necessary to support the elbows and counter the trust produced by the liquid’s change of direction. When an elbow diverts liquid flow, the change in direction produces a force through the elbow in-line with the flow direction. The elbow will try to move with the liquid. If the force from the liquid is large enough an unsupported pipe joint will fail. Thrust blocks or pipe supports must be installed to absorb the force and hold the pipe in place.

Mike Sondalini – Equipment Longevity Engineer

 

[ninja_form id=431]

If you found this interesting, you may like the ebook Process Control Essentials.

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

About Mike Sondalini

In engineering and maintenance since 1974, Mike’s career extends across original equipment manufacturing, beverage processing and packaging, steel fabrication, chemical processing and manufacturing, quality management, project management, enterprise asset management, plant and equipment maintenance, and maintenance training. His specialty is helping companies build highly effective operational risk management processes, develop enterprise asset management systems for ultra-high reliable assets, and instil the precision maintenance skills needed for world class equipment reliability.

« Walking on Shifting Sands in the Age of Uncertainty
Who Is Responsible For Reliability? Everyone! »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by
Mike Sondalini
in the
Plant Maintenance series.

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy