Decision Type:
Method Category:
Categories: Terms
The required number of acceptable, successive item during 100% inspection in a continuous sampling inspection to trigger reducing the amount of inspection.
« Back to Glossary IndexYour Reliability Engineering Professional Development Site
by Fred Schenkelberg Leave a Comment
The required number of acceptable, successive item during 100% inspection in a continuous sampling inspection to trigger reducing the amount of inspection.
« Back to Glossary IndexI am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.
Leave a Reply