Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Gain Control Over Your Equipment Using Reliability Centered Maintenance (RCM)

by Nancy Regan 1 Comment

Gain Control Over Your Equipment Using Reliability Centered Maintenance (RCM)

Gain Control Over Your Equipment Using Reliability Centered Maintenance (RCM)

I know.  I’m a lady.  But it’s not my expression. That’s what my mentor, John Moubray, called it.

And he didn’t apologize for it when he used exactly that term during a one-on-one mentoring session with me.

And to this day, it’s one of the most valuable (and profitable) lessons he ever taught me.

In fact, it helped me win $1,428 in a poker tournament.

And it can help YOU gain control over your equipment.

The best way I can explain F**k-off power is through my own story.

I promise that this IS applicable to your assets AND Reliability Centered Maintenance (RCM), so please stick with me…

…I was deep in a 100+ person, No Limit Texas Hold’em poker tournament at the Aria casino in Las Vegas, Nevada. Nine players were left but only eight would “cash.”

I was the short-stack at the table. (In poker lingo, that means I was the one with the smallest amount of chips.) 

And at a poker table, chips are the only thing that matters. The more you have, the more powerful you are.

I was careful and bided my time until one more entrant was eliminated, and I squeaked “into the money.”

Eighth place paid $290 but first place paid $3,250. If I got knocked out next, I would only “net” $150…and I really wanted to cash for more.

That’s when I decided to implement what John taught me.

Here’s F**k-off power in a nutshell: The one with the “highest need” has the “least amount of power.” 

Obviously the one with “high need and low power” is at a distinct disadvantage.

So as soon as I made it into the money, I decided that I would risk elimination in pursuit of a higher cash. I was willing to lose, and that put me in a more “powerful” position.

I chose my spots wisely and went “all-in” on three occasions – each time risking my entire stack on a single hand. 

All three times my opponents folded, and I won the blinds and antes…enough to keep me “alive.”

After 35 minutes of eight-handed play, the massive chip leader (and thus the most powerful player) at the table, announced that he was hungry and suggested a “chip chop” so he could “go to dinner.”

That meant that, if everyone agreed, each remaining player would receive the percentage of the prize pool that corresponded to how many chips each had.

We all agreed to hear the numbers. I told myself that my “number” was $600. Anything less than that, and I would risk elimination and continue playing. 

The floor man read the numbers. If I agreed to “chop,” I would get $590 ($10 shy of my goal).

At the Aria, to avoid any recrimination, each player is given a “yes” and a “no” plaque. Each player votes by putting one of the plaques face-down in the middle of the table. It must be a unanimous vote, or no chop is allowed.

With one quick swish, the dealer fanned the plaques on the table face up. There was one “no” vote amongst seven “yes” plaques.

And it was mine.

But nobody knew that.

The hungry chip leader grumbled and asked who the “no” vote was. I remained silent. 

No one suspected it was me because usually the short stack – the one with least amount of power – wants to chop.

The hungry chip leader didn’t realize it, but he relinquished some of his power. I knew he wanted the tournament to end and I used it to my advantage. 

The eighth player was eliminated and the seventh quickly followed.

Six players remained. The next one eliminated would earn $560.

The hungry chip leader called for another chip chop.

In my mind, I decided that I would chop if my portion of the prize pool was at least $800.

The floor man read us the numbers. If I agreed to chop, I would get $790…I smiled and told myself “no.”

We all voted.

Swish.

Again, only one “no” plaque graced the table.

But still, no one suspected it was my vote. 

Now I had even fewer chips remaining than before.

The chip leader wasn’t just hungry. He was frustrated, too. He really wanted to go to dinner.

So as the dealer was shuffling the cards for the next hand, the hungry chip leader suggested an “even chop.” 

That meant that the entire prize pool would be distributed equally amongst all remaining six players, regardless of chip stacks…$1,428 each!

As soon as he said it, as nonchalantly as I could, I told him I thought that was a great idea and that maybe that would sway the “no voter” to vote “yes.” 

Ellie, the lady playing next to me whom I became friendly with, said she would agree, but she didn’t want to waste any more time with another vote. She assumed that whoever was voting “no” would probably still vote “no.”

“Rats,” I yelled in my head.

“Come on Ellie,” I coaxed. Let’s give it one more try. 

Reluctantly, she agreed.

We all voted for a third (and final) time.

With one quick swipe, the dealer fanned six “yes” plaques on the table and I earned $1,428 – nearly $1,000 more than if I had made the first deal an hour earlier.

So, what does this have to do with our equipment?

Plenty!

You see, when you do Reliability Centered Maintenance, you take control.

You proactively identify all the reasonably likely Failure Modes that could occur in the operating context…

 …AND you decide how to manage them.

That means you only assign technically appropriate scheduled maintenance tasks and their associated frequencies.

In other words, you do maintenance on YOUR terms and NOT on your equipment’s terms.

But it’s not just about maintenance. 

When you do RCM, you identify your asset’s vulnerabilities that may be putting your organization at risk, and you decide how to manage those, too…

… on YOUR terms, NOT on your equipment’s terms.

So, what does all this mean?

At the poker table it meant an extra $1,000 for me.

For your organization it means saying good-bye to excessive unplanned downtime, chronic equipment unreliability, and unacceptable risk.

That’s right. YOU hold all the chips. YOU have all the power.

And you get to have dinner whenever you darn well please!

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

About Nancy Regan

Nancy Regan is a leading authority on Reliability Centered Maintenance (RCM).   She has over 20 years’ experience of hands-on practice facilitating RCM analyses, conducting RCM training, and assisting her clients in implementing RCM programs.  With RCM, she helps organizations achieve goals such as reducing maintenance costs, identifying the cause of chronic failure, and shifting from a reactive to a proactive maintenance environment.  Nancy also helps people overcome the organizational challenges that are in the way of creating an effective Reliability Culture.

« Failure Rate Classification for RCM
Day 2 Maintenance Planning Slides with Complete Explanations »

Comments

  1. Larry George says

    September 25, 2022 at 4:40 PM

    Great stories! I was nice that cooperation led to better payoff even if it was uncomfortable for some.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Nancy Regan
in the Everyday RCM series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy