Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / FMEA Q and A – Where do reliability requirements belong in an FMEA?

by Carl S. Carlson Leave a Comment

FMEA Q and A – Where do reliability requirements belong in an FMEA?

FMEA Q and A – Where do reliability requirements belong in an FMEA?

FMEA Q and A

Can you take into account reliability or durability functions in an FMEA? How can this be done? A reader asks this question, and it  is discussed and answered in this FMEA Q and A article.

“A prudent question is one-half of wisdom.”
Francis Bacon

Reader’s question:

If a customer requires a product life to reach 1 million cycles, but the product cannot reach 1 million cycles without failure, may I use “life less than 1 million cycles” as a failure mode in the FMEA?

Answer to reader’s question:

You have an interesting question about a “failure mode” occurring at a time that is less than the required life cycles. By definition, a Design FMEA considers the likelihood of failure during the design life of the product. In my opinion, a failure mode “less than required life cycles” is too general. I suggest that you define the primary functions of the product, and analyze how each of the functions can fail during the design life of the product. This will take into account any failures that occur at a time that is less than the required life cycles.

There can be an exception to this answer. Let’s say one of the primary functions of your product has to do with reliability or durability, and you want to include that function in your FMEA. We’ll take a fictitious example of a widget that is designed to be very durable (with specific durability requirements). You could add the durability function to the other primary performance functions. When analyzing the durability function with the FMEA procedure, you ask the team the manner in which the widget fails to accomplish the durability function. This may result in specific failure modes that relate to wear out or extreme stress, that do not necessarily get taken up with the performance functions.

One other point. In most FMEA applications, the operating and environmental requirements are agreed to by the FMEA team as part of FMEA project preparation. They can be documented in the Assumptions step of FMEA preparation. Subsequently, when the team considers various FMEA functions, the operating and environmental requirements are assumed to be present. This avoids having to repeat the operating and environmental requirements in each function description. In many FMEA applications, the item’s reliability requirements are included and documented in this preparation step.

Next Article

All the work in an FMEA through risk prioritization is leading up to the Recommended Actions. Without effective corrective actions, risk will not be reduced to an acceptable level. In the next article, the subject of developing effective recommended actions is discussed, including examples and tips.

[display_form id=415]

Filed Under: Articles, Inside FMEA, on Tools & Techniques

About Carl S. Carlson

Carl S. Carlson is a consultant and instructor in the areas of FMEA, reliability program planning and other reliability engineering disciplines, supporting over one hundred clients from a wide cross-section of industries. He has 35 years of experience in reliability testing, engineering, and management positions, including senior consultant with ReliaSoft Corporation, and senior manager for the Advanced Reliability Group at General Motors.

« How Do You Respond When Engineering Struggles?
Rolling Bearing Vibration Detection »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Carl Carlson
in the Inside FMEA series

[popup type="" link_text="Logo Info" ]

Information about FMEA Icon

Inside FMEA can be visually represented by a large tree, with roots, a solid trunk, branches, and leaves.

- The roots of the tree represent the philosophy and guiding principles for effective FMEAs.
- The solid trunk of the tree represents the fundamentals for all FMEAs.
- The branches represent the various FMEA applications.
- The leaves represent the valuable outcomes of FMEAs.
- This is intended to convey that each of the various FMEA applications have the same fundamentals and philosophical roots.

 

For example, the roots of the tree can represent following philosophy and guiding principles for effective FMEAs, such as:

1. Correct procedure         2. Lessons learned
3. Trained team                 4. Focus on prevention
5. Integrated with DFR    6. Skilled facilitation
7. Management support

The tree trunk represents the fundamentals of FMEA. All types of FMEA share common fundamentals, and these are essential to successful FMEA applications.

The tree branches can include the different types of FMEAs, including:

1. System FMEA         2. Design FMEA
3. Process FMEA        4. DRBFM
5. Hazard Analysis     6. RCM or Maintenance FMEA
7. Software FMEA      8. Other types of FMEA

The leaves of the tree branches represent individual FMEA projects, with a wide variety of FMEA scopes and results. [/popup]

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy