Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Facilitation Skill # 8 – Brainstorming

by Carl S. Carlson Leave a Comment

Facilitation Skill # 8 – Brainstorming

Facilitation Skill # 8 – Brainstorming

The mere formulation of a problem is far more essential than its solution, which may be merely a matter of mathematical or experimental skills. To raise new questions, new possibilities, to regard old problems from a new angle, requires creative imagination and marks real advances in science. – Albert Einstein

In this article, we will discuss how to use brainstorming to enhance FMEA effectiveness, and when (and when not) to use brainstorming.

What is “brainstorming”?

The Oxford English Dictionary defines “brainstorm” as, “a spontaneous group discussion to produce ideas and ways of solving problems.”

Brainstorming is a technique for getting a flow of ideas on the table before making decisions. This technique is most useful when a decision or solution is not easily forthcoming. The purpose of brainstorming is to allow people to “put ideas on the table without fear of being corrected or challenged. It separates the creation of ideas from the evaluation activity.” The outcome of brainstorming is a list of creative ideas involving the entire team.

What are the “rules” of brainstorming?

The rules of brainstorming include:

  1. Let ideas flow freely
  2. Defer evaluation of ideas until later
  3. Build on ideas of others
  4. Nurture creativity
  5. Defer debates
  6. Everyone participates
  7. Think “out of the box”
  8. Keep discussions moving

How should brainstorming be used in FMEA applications?

Brainstorming is best used when there is a specific question that needs answering, and the facilitator would like to open up the flow of ideas. For example, if the team is working on identifying “Recommended Actions” for a difficult issue, it may be helpful to use brainstorming to open up the flow of ideas before working towards consensus on the specific recommendations.

When the FMEA facilitator observes the need for brainstorming to support the FMEA, he or she should let the team know that they will begin a brainstorming session and inform them of the rules. Ideas generated are recorded temporarily. The brainstorming session ends when the ideas are no longer forthcoming, and the facilitator lets the team know that the brainstorming session has ended. The ideas are then critiqued, and appropriate entries are made to the FMEA.

There are many variations of brainstorming. A number of useful variations are covered in chapter 10 of Effective FMEAs.

Why does brainstorming work?

People sometimes hold back on ideas for fear of criticism. This is a form of self-censoring. If you ask a team if they have ideas on how to solve a problem, they may hold back ideas that are open to criticism.

When a team is allowed to generate ideas without criticism, some of the ideas are silly or not useful. However, once the flow of ideas begins, there are times when a real gem of an idea is brought forward. That is the purpose of brainstorming.

FMEA Tip

It is natural and healthy for engineers to critique ideas. That is important in an FMEA. For this reason, brainstorming sessions have a beginning and an end. Always say to the FMEA team, “start of brainstorming” (to highlight the lack of critique) and “end of brainstorming” (to resume normal critiquing).

Next Article

There are many times in an FMEA project when it becomes essential to foster the creative forces of FMEA team members and apply them to the task at hand. In the next article, we’ll explore what is creativity and how an FMEA facilitator can harness the power of creativity to solve seemingly unsolvable problems.

[display_form id=415]

 

Filed Under: Articles, Inside FMEA

About Carl S. Carlson

Carl S. Carlson is a consultant and instructor in the areas of FMEA, reliability program planning and other reliability engineering disciplines, supporting over one hundred clients from a wide cross-section of industries. He has 35 years of experience in reliability testing, engineering, and management positions, including senior consultant with ReliaSoft Corporation, and senior manager for the Advanced Reliability Group at General Motors.

« LNG Regasification Facilities: Consider High Pressure Releases
Successful Reliability Centered Maintenance (RCM) Implementation »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ][display_form id=266][/popup]

The Accendo Reliablity logo of a sun face in circuit

Please login to have full access.




Lost Password? Click here to have it emailed to you.

Not already a member? It's free and takes only a moment to create an account with your email only.

Join

Your membership brings you all these free resources:

  • Live, monthly reliability webinars & recordings
  • eBooks: Finding Value and Reliability Maturity
  • How To articles & insights
  • Podcasts & additional information within podcast show notes
  • Podcast suggestion box to send us a question or topic for a future episode
  • Course (some with a fee)
  • Largest reliability events calendar
  • Course on a range of topics - coming soon
  • Master reliability classes - coming soon
  • Basic tutorial articles - coming soon
  • With more in the works just for members
Speaking of Reliability podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Dare to Know podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Accendo Reliability Webinar Series podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy