Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Extended Bogy Testing

by Dennis Craggs Leave a Comment

Extended Bogy Testing

Extended Bogy Testing

Extended Bogy Testing

Introduction

Extended bogy testing builds on test to bogy (TTB), discussed in a prior article. TTB focused on calculating the number (N) of parts tested to one life bogy, with 0 failures allowed, to a specified reliability (R) and confidence (C) levels.

Using TTB to verify conformance to high reliability and confidence targets requires very large sample sizes, increasing testing cost. The capacity to test large samples may require large facility capital expenditures. Also, the zero failures allowed paradigm removes the opportunity to learn about product failure modes and the opportunity to improve the product through design or manufacturing process changes.

This article focuses on extended bogy test plans as an alternative to TTB.

Success-Run and Weibull

A success run test plan provides the sample size required when testing to one life bogy with defines reliability and confidence goals, equation 1

$$R^N=1-C$$

(1)

The Weibull reliability equation describes the reliability at any time t, given a characteristic life $-\theta-$ and slope $-\beta-$ for a failure mode, equation 2

$$R(t)=e^{-(t/\theta)^\beta}$$

(2)

By combining the natural logarithm of equations 1 and 2, yields

$$\frac{1}{N}ln(1-C)=-(t/\theta)^\beta$$

(3)

For any desired reliability and confidence, equation 3 allows the calculation of a desired sample size N when tested to time t.  To obtain a form that eliminates $-\theta-$, use equation 4

$$\frac{(1/N)ln(1-C)}{(1/N_0)ln(1-C)}=\frac{-(t/\theta)^\beta}{-(t_0/\theta)^\beta}$$

(4)

Which simplifies to

$$N=N_0(t_0/t)^\beta$$

(5)

Equation 5 is combined with equation 1 to yield

$$N=(t_0/t)^\beta(ln(1-C)/ln(R))$$

(6)

Equation 5 relates the test sample sizes (N), for specific reliability (R) and confidence (C) targets, and a test bogy (t0) required for test time t. Variable t may be time, miles, or cycles. The parameter $-\beta-$ is unknown, however, failure modes beyond the life bogy target are usually wear-out failures with $-\beta>1-$. For test planning purposes an accepted approach is to set $-\beta=2-$.

Example 1

Consider a reliability verification test with a target of R99/C90. For TTB, the sample size required is N0=230 parts. If $-\beta=2-$ and t/t0=3, then using equation 4, then the required verification test sample size was reduced to N=26 parts.

Note that this test strategy reduces the test sample size at the expense of increased test time. Also, the test is focusing on wear out failure modes. To minimize the test time penalty, the task of accelerating the test to reduce test time will be discussed in a future article.

Example 2

An automotive electromechanical switch was being tested to verify R95/C90. The TTB sample size was 45 parts, but the supplier’s test fixture could test only 8 parts simultaneously. The extended test bogy was established as 850,000 cycles over 100,000 miles of usage. In this case, $-\beta=1.7-$ was a corporate standard for planning extended bogy testing. Equation 6 was used to determine 2,187,000 cycles were the extended test bogy.

The calculations were incorporated into a visual basic macro. A screen shot of the window is shown in figure 1,

Figure 1

This macro incorporated equations 1 to 5, plus a Bayesian modification to equation 1. It makes it very easy to tradeoff sample sizes with test durations, reliability, confidence, and Weibull slope. However, it is not required as the options can be calculated manually with equation 6.

The test duration was rounded up to 2.2 million cycles. The equipment was able to execute 1 cycle/second and operated 24 hours/day. The test time required was almost 26 days, which was consistent with program timing. During the test, two defects were detected, analyzed, and remove with simple design changes. Later, the improved product was verified to 4,000,000 cycles without failure and there were no reported field failures.

Summary

Extended bogy tests

  1. Provide a means of reducing the samples required for high reliability and confidence tests.
  2. Test time is increased, but the capital expenses for additional test facilities are reduced.
  3. All failures should have the root cause of failure determined.
  4. Failures prior to one life bogy would be considered a test failure.
  5. Failures beyond one life would not be considered test failures unless the Weibull analysis showed the R/C targets were not met.

Note

If you want to engage me on this or other topics, please contact me. I offer a free hour for the first contact to discuss your problem/concerns and to determine how I can help you.

I have worked in Quality, Reliability, Applied Statistics, and Data Analytics over 30 years in design engineering and manufacturing. In the university, I taught at the graduate level. I also provide Minitab seminars to corporate clients, write articles, and have presented and written papers at SAE, ISSAT, and ASQ. I want to help solve your design and manufacturing problems.

Dennis Craggs, Consultant
810-964-1529
dlcraggs@me.com

Filed Under: Articles, Big Data & Analytics, on Tools & Techniques

About Dennis Craggs

I am a mechanical engineer, programmer, and statistician. My career spanned the aerospace, NASA and Teledyne CAE, and automotive, Ford and Chrysler, industries. After retirement, I started consulting as a reliability engineer and am writing articles on big data analytics. My primary goal is to assist young engineers and consult on product development issues.

« Small Satellites, Emerging Technology and Big Opportunities (part four of seven) – Lets Learn about Reliability
Product Specification, Use Case, and Environment »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Big Data & Analytics series Article by Dennis Craggs

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy