Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Establishing the Frequency of On-Condition Maintenance Inspections

by James Kovacevic Leave a Comment

Establishing the Frequency of On-Condition Maintenance Inspections

Ensuring The Inspections Will Catch the Defect Before A Functional Failure Occurs

Ever wonder how some organizations make their vibration or thermographic program work, and not only work but deliver huge results to their organization?  They use a systematic approach to establishing the correct frequencies of inspection.   Establishing the correct frequencies of maintenance activities is critical to the success of any maintenance program.   Too infrequently and the organization is subjected to failures, resulting in poor operational performance.  Too frequently, and the organization is subjected to excess planned downtime and an increased probability of maintenance induced failures.

This article will continue the discussion on establishing the correct frequency in a maintenance program.  There are three different approached to use, based on the type of maintenance being performed;

  • Time-Based Maintenance
  • On-Condition Maintenance
  • Failure Finding Maintenance

This article will focus on On-Condition Maintenance.  While establishing the frequency for Fixed Time Maintenance activities is complex and is more of science, establishing the frequency for Condition Based Maintenance inspections (or On-Condition) is a mix of science and art.

Construct the P-F Curve & Establish the P-F Interval

The first step to determining the inspection frequency for on-condition tasks is to construct the P-F curve and P-F interval. Constructing a P-F curve requires recording the results of the inspection and plotting the result versus the elapsed time.  If enough measurements are taken, a fairly consistent curve can be developed for each failure mode. Making sure that the data is gathered carefully and consistently will aid in increasing the quality of the P-F curve.   Lets use an example from RCM2;

  • The tread depth on a tire is directly related to the linear distance traveled.  Based on the data collected, it is safe to say that for every 3000 miles the tire wears 1mm.  So for a tire with 12mm tread when new, a potential failure point of 3 mm and a failure point of 2mm, the P-F interval is 3,000 miles.

Now this works quite well for linear P-F curves because it is predictable.  So how do you construct a P-F curve for a non-linear failure mode?  It is a bit more complex, and a bit more of art.  Let’s use another example;

  • A bearing will operate with minimal vibration under normal operations.  As a defect materializes, the vibration will increase exponentially as the defect gets worse.   While the P-F Interval will be the time (or operating cycles) from the point the defect can be detected (potential failure point) to the point it becomes a functional failure, its rate of deterioration will increase dramatically towards the end of its life.  This can be quantified just as the tire in the above example, with the right data.

With P-F curve and P-F Interval (PFI) established, the frequency can be determined.

Select the Right Frequency for Inspection

Once the P-F Interval (PFI) is established, the inspection frequency can be determined.  Thankfully it is not as complicated as establishing Fixed Time Maintenance frequencies.  To determine the inspection frequency, the formula is either PFI/3 or PFI/5.

  • Standard Inspection – the frequency of inspection for most equipment should be approximately 1/3 of the P-F interval (Formula = PFI/3).  For example, a failure mode with a P-F interval of 3000 miles should be inspected every 1000 miles.
  • Critical Equipment Inspection – the frequency of inspection for critical equipment should be approximately 1/5 of the P-F Interval (Formuala = PFI/5).  For example, a failure mode on a critical piece of equipment with a P-F interval of 3000 miles should be inspected every 600 miles.

Now the above works well for linear P-F curves, so how do you establish the frequency for the non-linear curves?  You use the same approach as above for the initial inspection frequency.

However, once a potential failure is detected, additional readings should be taken at progressively shorter intervals until a point is reached that a repair action must be taken. For example; the initial inspection frequency is every four weeks.  Once a defect is detected, the next inspection will be at three weeks, then two weeks and then ever week.

This is only guidelines and should be adjusted based on the method used to track and trend data, the lead time of the repair parts (if not kept on site), and how quickly the data will be analyzed, and the repair work planned.  If your planning process is poor, the frequency should be more frequent, to allow for a high chance of detection sooner.

How much thought was put into your Condition Based Maintenance inspection frequencies?  Have you broken down each failure mode trended the data and established the frequency using a systematic approach?   As with the Fixed Time Maintenance activities, you may be over or under inspecting, costing your organization reliability or money.

Remember, to find success; you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.
I’m James Kovacevic
Eruditio, LLC
Where Education Meets Application
Follow @EruditioLLC

References;

  • RCM2 by John Moubray
  • Establishing Fixed Time Maintenance Frequencies

 

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« Not a car analogy: How RG is like cooking
Reliability in Equipment Design »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy