Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Establishing Fixed Time Maintenance Intervals

by James Kovacevic Leave a Comment

Establishing Fixed Time Maintenance Intervals

How to Select The Optimum Fixed Time Maintenance Intervals

Think about your maintenance program. How often are your PMs scheduled?  How were those frequencies established?   If you are in the majority, the chances are that the frequencies were either established from the OEM manual, or by someone in the department without data.

Establishing the correct frequency of maintenance activities is critical to the success of any maintenance program.   Too infrequently and the organization is subjected to failures, resulting in poor operational performance.  Too frequently, and the organization is subjected to excess planned downtime and an increased probability of maintenance induced failures.  So how do you establish the correct maintenance frequencies for your organization?   There are three different approached to use, based on the type of maintenance being performed;

  • Time-Based Maintenance
  • On-Condition Maintenance
  • Failure Finding Maintenance

This article will focus on Time Based Maintenance Tasks.

Time-Based Maintenance Tasks

“The frequency of a scheduled task is governed by the age at which the item of or component shows a rapid increase in the conditional probability of failure” (RCM2).  When establishing frequencies for Time Based Maintenance, it is required that the life be identified for the component based on data.

With time-based failures, a safe life and useful life exists.  The safe life is when no failures occur before that date or time.  Unless the failure consequence is environmental, or safety related, the safe life would not normally be used.   The useful life (economic life limit), is when the cost of consequences of a failure starts to exceed the cost of the time-based maintenance activity.   There is a trade-off at this point between the potential lost production and the cost of planned downtime, labour, and materials.

So how is the safe life or useful life established?  It is established using failure data and history.  This history can be reviewed using a Weibull Analysis, Mean Cumulative Failure Analysis or even a Crow-AMSAA Analysis to statistically determine the life of the component.   Once that life is determined using a statistical analysis, the optimum cost effective frequency must be established.

Establishing the Optimum Economic Frequency

This formula is used to establish the economic life of the component, balancing the cost of the downtime vs. the cost of the replacement.

 

 

Where;

  • CT= The total cost per unit of time
  • Cf= The cost of a failure
  • CP= The cost of the PM
  • T = The time between PM activities

The formula will provide the total cost based on the maintenance frequency. Since the calculation can be time-consuming, Dodson developed a table which can be used if;

  • The time to fail follows a Weibull Distribution
  • PM is performed on an item at time T, at the cost of CP
  • If the item fails before time = T, a failure cost of Cf is incurred
  • Each time a PM is performed, the item is returned to its initial state “as good as new”

Therefore when using the table, use formula; T=mѲ+δ.  Where;

  • m is a function of the ratio of the failure cost to PM cost and the value of the shape
  • Ѳ is the scale parameter of the Weibull distribution
  • δ is the location parameter of the Weibull distribution

In the example below, you can see how the table can be used with the formula;

The cost for a PM activity $60.  The cost of a failure for the same item is $1800.  Given the Weibull parameter of B=3.0, O=120 days, and δ =3 how often should the PM be performed?

  • Cf/ CP = x
  • 1800/60 = 30

The table value of m given a shape parameter B of 3.0 is 0.258.  Therefore;

  • T=mѲ+δ
  • T = (0.258)(120)+3 = 33.96
  • T = 34 days for each PM

As you can see, determining the frequency of Fixed Time Maintenance tasks is not as simple as picking a number out of a manual or based on intuition.  Armed with this information, a cost effective PM frequency based on data can be developed for your Fixed Time Maintenance tasks.   This will ensure the right maintenance is done at the right time, driving your plant performance further.

Does you Fixed Time Maintenance Tasks have this level of rigor behind them?  Why, not?  After all, your plant performance (operational and financial) depends on it.   Stay tuned for next week’s post on establishing frequencies for On-Condition tasks.

Remember, to find success; you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic
Eruditio, LLC
Where Education Meets Application
Follow @EruditioLLC

References;

  • RCM2 by John Moubray
  • CRE Primer – Quality Council of Indiana

 

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« Project Communications
The Value of a Great Question »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy