Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Why Don’t They Care?

by Gina Tabasso Leave a Comment

Why Don’t They Care?

Why Don’t They Care?

by Alan Ross

“Why don’t they care?”

“About what?”

“About electrical system reliability?”

“Who says they don’t care?”

“You do. Quite often, as a matter of fact.”

That isn’t exactly how the conversation went, but you get the picture. A relatively new employee, who is about to embark on his transformer reliability career, was parroting my own words back to me. I didn’t think I said that a lot, though. Maybe once or twice? Maybe more often than I think?

Actually, I probably say something along those lines a little too often. And I mean it. Why don’t people seem to care about their power system reliability?

By people, I mean leadership. Why don’t the leadership at industrial facilities care as much about transformer reliability as I want them to? I think it’s because they don’t know what they don’t know. It’s a blind spot. They know about risk and reliability of most of their major assets those assets have been front and center in their CMMS for decades. EAM systems are all about asset management and maximization.

So how has the lonely transformer slipped by unnoticed and unloved? I think it’s because transformers have been too reliable for too long. Transformers bought before 2000 have been the best buy in asset purchases. In fact, transformers manufactured in the 1970’s were way overbuilt, and we have become too dependent on that fact. That trend, however, has been over for decades.

In recent years, transformers have not built to the same high standard as their 20th century counterparts. For example, we see growing evidence that the failure rate of transformers purchased in the last decade have been anything but as reliable as those from the past. Loss ratios for newer units are sometimes greater than they are for transformers over 20 years old.

So how do we get leadership to sponsor a good transformer reliability program? One way is to provide them with a Reliability Audit. An audit takes into account critical factors, and a pattern emerges. From that pattern, maintenance budgets and capital budgets can be planned.

One thing I do know about leadership is that we love to know that there is a solid, workable and well thought out plan in place for major asset management.

It’s all about knowing the health of your system and planning accordingly.


Alan Ross is the President of the Electric Power Reliability Alliance (EPRA). He is responsible for leading the alliance to build electric system reliability in the industrial and commercial marketplace. Formerly, Alan was the Vice President of Reliability at SD Myers.

Filed Under: Articles, on Maintenance Reliability, The Intelligent Transformer Blog

About Gina Tabasso

Gina Tabasso, Barracuda B2B Marketing, a Lean Six Sigma manufacturing-minded marketing strategist who helps manufacturing, trade, industrial, distribution, and B2B companies grow. Here's how we're different from every other B2B marketing company on the planet that claims to "specialize" in manufacturing/industrial:
* More than 30 years in-house with manufacturing, distribution and trade companies
* Worked for the Ohio Manufacturing Extension Partnership (MEP)
* Lean Six Sigma Yellow and Green Belts with Black to be earned in 2024
* Completed six Lean Six Sigma projects and applies this methodology to her marketing process
* Welding certified
* Managed American Machinist, Welding Design and Fabrication, Gases & Welding Distributor, and Construction News
* More than 30 years in marketing

« The Moving Target of Excellence
Modeling in Chaotic Environments »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Editor Gina Tabasso
of the The Intelligent Transformer Blog

Articles written by the folks at SDMyers

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy