Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Design Assumption Risks

by Greg Hutchins Leave a Comment

Design Assumption Risks

Design Assumption Risks

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

This story is about risk at the enterprise program/project level.  Design is based on primarily requirements and assumptions.  Meeting requirements is usually achievable if they are complete and clear. Soft or poorly written requirements are the source of cost and schedule growth for many projects. Assumptions made during the analysis or design phase if wrong are also a source of poor project performance. This story is one example of a bad assumption.

Background

I was the project manager for a chilled water system designed to cool a shipborne radar. The unit was required to provide 350 gallons/minute at a specified chilled water temperature range. Pump selection was made to meet these requirements based on the pump curve. The curve showed the flow rate that would be achieved at a specific head pressure.   Each pump has a performance curve determined by tests performed by the manufacturer.  Typically, each pump comes with 2-3 impeller sizes to provide some flexibility in determining the correct flow rate after installation on the ship (in this case).

Pressure Drop

The pressure drop for the chilled water unit was primarily due to the piping and flow components in the system that connect the chilled water unit to the heat source.  The pressure drop was calculated based on the physical routing of the piping to the drawings as well as the flow component sections.  The assumption made for the calculations was the piping system would be installed per the drawings.  If this was not the case, the pressure drop (hence the pump flow rate) could be less than requirements resulting in a potential serious problem.

Risk Assessment

Based on an informal meeting, the biggest risk seen by engineering and leadership team was finding out the performance requirements were not met after installation of the system on the ship. It would be much more expensive and cause potential significant schedule delay if modifications to the system had to be done on the ship.  The mitigation plan for this risk was determined to be an engineering performance test conducted in the factory to verify performance before installation on the ship. The test included: chilled water unit; piping and flow devices; heat source provided by a custom furnace; PLC (programmable logic controller) for the chilled water unit; and instrumentation.  The piping and flow component selection was based on meeting the same pressure drop as calculated and expected on the ship. The test results showed the chilled water system performance met the requirements. No modifications were needed. The unit was disassembled and shipped to the shipyard for installation. It shipped with the medium impeller installed.

Installation on The Ship

The chilled water unit was installed without incident.  However, the piping run to the heater was not installed per print due to unexpected interferences resulting in a much longer piping routes with many more bends than assumed. Hence, a greater pressure drop than calculated.   Once the unit was up and running, a performance test showed the flow rate was considerably below the required performance. After a brief assessment, it became clear the actual pressure drop was significantly higher than calculated.  Fortunately, the solution to the problem was solved by swapping out the medium sized impeller with the large one. With this modification, the chilled water system performed to specification.

Lesson Learned

  1. Conduct a formal risk assessment-not an informal one. If a formal risk assessment was done in this case, the pressure drop assumption may have been identified and mitigated.
  2. When performing a risk assessment on a project, it is very important to assess the design (and other) assumptions made. Many times, bad assumptions go undetected causing havoc later on.
  3. Make sure your design assumptions can be realized in the field. In this case, it is a little naive to think piping on a ship will be accomplished per drawings. In real life, unexpected interferences or obstacles change the piping route shown on the drawings resulting in higher pressure drop. Always had margin to account for the unknown.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« The 9 Great Benefits of a CMMS*
Respect all and fear none – Coaching and NPD »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy