Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Confined Space Entry Safety

by Mike Sondalini Leave a Comment

Confined Space Entry Safety

Confined Space Entry Safety

A confined space is anywhere not normally meant for human habitation in which access maybe restricted and the conditions in the confinement may be inadequate to support life or could cause engulfment. Obvious places are tanks, vessels, silos and below ground pits. The less obvious ones are cold rooms, areas of plant sandwiched between machinery and equipment, tip truck trays and open pit mines.

Keywords: risk assessment, hazard identification, job safety analysis, safe atmosphere. 

WHAT IS A CONFINED SPACE?

A confined space is anywhere not normally meant for human habitation in which access maybe restricted and the conditions in the confinement may be inadequate to support life or could cause engulfment. Obvious places are tanks, vessels, silos and below ground pits. The less obvious ones are cold rooms, areas of plant sandwiched between machinery and equipment, tip truck trays and open pit mines.

In Australia it is law that entry into confined spaces must meet the requirements of Australian Standard AS 2865 – 1995 ‘Safe working in a confined space.’

REQUIREMENTS FOR CONFINED SPACE ENTRY

Listed below are the key issues when conducting work in confined spaces but AS 2865 is the overriding requirement.

1. Request for work.

A request for work in a confined space must be documented and authorised by the ‘owner’ of the confined space.

2. Can work be done without entering confined space?

Can be done from outside the confined space? Consider modifications to remove the need to enter the confined space or to make exit and entry easier and safer.

3. Hazard Identification/Risk assessment.

Before entering a confined space a documented hazard identification and risk assessment must be done by competent persons with employee involvement. A register of confined spaces on-site must be kept and be up-to-date.

All risks identified in the risk assessment are to be eliminated or reduced to acceptable levels by appropriate methods prior to entry into the confined space.

4. Isolate parts, materials and services.

Prior to entering a confined space all potentially hazardous services, including all process services, normally connected to the space are isolated to prevent:

  • introduction of any materials, contaminants, agents or conditions harmful to persons occupying the confined space;
  • the activation or energising in any way of equipment or services which may pose a risk to health or safety of persons

5. Cleaning and purging (if necessary)

Where appropriate the confined space is to be cleared of contaminants by use of a suitable purging agent. Gas mixtures with oxygen at greater than 21% by volume are not to be used for purging or ventilation.

6. Evaluate atmosphere

Before entering the confined space it must

  • contain a safe oxygen level;
  • have atmospheric contaminants reduced to below the
    relevant MSDS exposure limits;
  • be free from extremes of temperature;
  • ensure the concentration of flammable contaminants in the atmosphere are below 5% of the LEL (Lower explosive limit on the Material Safety Data Sheet).

7. Is atmosphere safe for entry? Eg safe oxygen level, no toxic gases.

No entry or work is allowed in the confined space or on the outside of the confined space if:there is

  • there is risk to health or safety of persons in the confined space or working upon its surface; a risk of fire or explosion exists.
  • a risk of fire or explosion exists.

8. Ventilate (to maintain environment)

Ventilate the confined space by natural, forced or mechanical means. If mechanical means are used insure their use does not introduced unforeseen hazards and risks (Eg. diesel fumes, additional power cables, etc).

9. Issue personal protective clothing and safety equipment (PPE)

Where a safe oxygen level cannot be achieved or the atmospheric contaminants cannot be reduced to safe levels no person enters the confined space unless equipped with suitable PPE including air supplied breathing equipment.

Equipment required to safely enter the confined space is to be appropriate for the confined space and be maintained in proper working order. All PPE and rescue equipment is to be fitted to suit the individual.

10. Authority to enter or work in confined space

Subject to the completion of a proper risk assessment, written approval in the form of an entry permit must be provided prior to entry.

No one can enter a confined space without a permit that:

  • includes any precautions or instructions necessary for safe entry and work execution;
  • is provided to the person in direct control of the work in the confined space;
  • records which persons enter the confined space
  • provides proof the persons involved in the work are advised of, understand and comply with the contents of the entry permit. Appropriate rescue and first aid procedures and provisions are to be planned, established and rehearsed.

11. Entry to confined space

Prior to any person entering a confined space, and during occupancy of the confined space, appropriate signs and protective barriers are erected to prevent entry of persons not involved in the work.

Where a risk to health and safety is identified in the risk assessment, no person may enter a confined space unless a stand-by person(s) is present outside the confined space.

Suitable equipment identified during the hazard and risk assessment is to be provided, where necessary, for:

  • personal protection;
  • rescue;
  • first aid;
  • fire suppression.

Training is required for all persons working in or on the confined space and in all relevant activities related to entering and working in or on confined spaces.

The training shall cover at least the following: the hazards of confined spaces;

  • hazard assessment procedures;
  • hazard control measures;
  • emergency procedures;
  • the selection, use, fit and maintenance of safety equipment.

Training is to be provided to all persons who:

  • perform work in or on confined spaces;
  • perform confined space assessments;
  • issue entry permits;
  • design and layout confined spaces;
  • manage and/or supervise persons (employees and contractors) working in or near confined spaces;
  • maintain equipment used for/during entry;
  • purchase, distribute, fit, wear and maintain personal protective equipment;
  • are on stand-by;
  • are involved in rescue and first aid procedures.

12. Test/monitor atmosphere regularly

Where the hazard and risk assessment indicates a potential for the atmosphere within a confined space to change due to release or by introduction of contaminants, arrangements are to be made to continuously monitor, or at appropriate intervals, retest the atmosphere within.

An atmospheric condition test is to be conducted at the start of each shift prior to entry into the confined space.

13. Approve for return to service

Confirm and acknowledge in writing that work in the confined space has been completed and that all persons involved in the work have left the space before giving authorisation to return the confined space to service.

Mike Sondalini – Maintenance Engineer

[ninja_form id=431]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

About Mike Sondalini

In engineering and maintenance since 1974, Mike’s career extends across original equipment manufacturing, beverage processing and packaging, steel fabrication, chemical processing and manufacturing, quality management, project management, enterprise asset management, plant and equipment maintenance, and maintenance training. His specialty is helping companies build highly effective operational risk management processes, develop enterprise asset management systems for ultra-high reliable assets, and instil the precision maintenance skills needed for world class equipment reliability.

« Making the Connection
Requirements Development and Risk Management »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by
Mike Sondalini
in the
Plant Maintenance series.

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy