Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Change and Resistance Are Futile

by Greg Hutchins Leave a Comment

Change and Resistance Are Futile

Change and Resistance Are Futile

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Organisations exist in a dynamic world where business uncertainty and socio-political volatility can adversely affect their existence.  The mass of data available and the contradictory interpretations that can be made add ambiguity and complexity to the mix.  Our modern day organisations, or at least their management or leadership team realise, or should realise, that their operating environments are changing and, in order to adapt and survive, they too need to change.

About 2,500 years ago the Greek Heraclitus philosophised that “the only constant in life is change” and he wasn’t wrong; and it’s not just that people live and then die.  Empires have come and gone, countries emerge and disappear, and organisations succeed, or fail, or merge or are acquired.  In order to survive we all need to adapt to the external environment whatever it may bring.  But people don’t generally accept change and many will hanker for the past and ‘the good times’.  “Living in the Past”, as the band Jethro Tull reminded us, may be about happy and smiling because our selective memories conveniently forget the bad times and embellish the good.

Corporations are no different and, as only the fit survive, change becomes the exercise required to stay fit.  There are tomes written about corporate change, how to implement it and why it’s resisted.  But what happens when change is required and planned but the very people who desire change want to live in their rose-tinted past?

Resisting Change

The management guru Kotter cited eight reasons for resisting change and, while the lack of management support to a change initiative is identified as the root of failure to change the consequences of such management failure can be dire.  The reasons and the immediate consequences of management’s inaction and clinging to a perceived ‘glorious past’ are summarised below:

An organisation, or rather its management team or leadership body may realise today that they need change.  However, in the inertia of adapting to change an ineffective leadership will dwell on their selective memory of the past and possibly conclude that things weren’t so bad after all and the organisation worked.  There’s also the fear at the leadership level that the systems they believed in and possibly even created are no longer effective and they may be criticised for not getting it right in the first place.

Failed Change

If change doesn’t go well and there are hiccups along the way it is all too easy to blame the ‘new’ and defend the ‘old’.  The manager who felt threatened by change and whose ego was challenged may well use these hiccups as a way of poo-pooing change.  The old, and ineffective way of working is heralded as being effective anyway and becomes even more ingrained into the corporate psyche and culture.  The move for ‘change’ loses momentum at the first hurdle and the hubris of the old guard is reinforced while those who support change are downtrodden.

The change initiative now becomes a survival plan as it competes against resistance reinforced by general reluctance.  The once threatened management team may now feel vindicated that the old way was OK but, in a self-satisficing gesture let the change plan progress in a ‘let’s try it and see’ act of benevolence with no intention of acceptance.  Such egotistical actions place the change process under such close scrutiny that every error is exaggerated and the overarching aim to change is clouded by criticism.

Failing to Change

Unfortunately, the original requirement for change is forgotten in the midst of criticism, accusations of failure and failed attempts.  The resulting turf war between the advocates for change and an old guard who defend the established ways and their established position of power detracts from progress.  Such arrogance and dogma may derail the change process but in the long run it may well accelerate the demise of the organisation.

Corporate Executives need to realise that there is a problem and be above the personalization of issues and accusations that individuals are wrong or not capable.  Mistakes are made and, like most mistakes, they can be corrected; but in any event they should not be held onto just because a long time was spent making the mistake.  If pride and ego get in the way the mistake is compounded and failure is inevitable.  For a change program to work it requires inward reflection and the modest acceptance that change must happen rather than a hubristic belief that all is well there’s no room for improvement.

Conclusion

Unsuccessful change is not good.  This can galvanise the belief that there is nothing wrong and any ’change’ is then believed to be wrong and merely reinforces the old way.

If the ‘old way’ allowed for a lack of rigorous process and planning then management based upon whims or fancies will prevail.  If the old way required mandatory and inflexible approaches then any agility to adapt to situations will be stultified.

For an implemented change program to succeed prior preparation and planning coupled with a positive commitment are essential for success.  An underlying belief that everything is tickety-boo and hunky-dory will reinforce the status quo and change will fail; arrogance and futility will prevail.

Bio:

Malcolm Peart is an UK Chartered Engineer & Chartered Geologist with over thirty-five years’ international experience in multicultural environments on large multidisciplinary infrastructure projects including rail, metro, hydro, airports, tunnels, roads and bridges. Skills include project management, contract administration & procurement, and design & construction management skills as Client, Consultant, and Contractor.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Asset Management is more than Maintenance
Who Owns the Storeroom? Maintenance or Procurement? »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy