Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles

Articles

Find all articles across all article series listed in reverse chronological order.

by Nancy Regan Leave a Comment

How to Choose Proactive Maintenance Strategies

How to Choose Proactive Maintenance Strategies

When it comes to our machines, we can do Condition-Based Maintenance and Preventive Maintenance in addition to other actions such as No Scheduled Maintenance or equipment redesigns. With those options available to us, how do we choose what to do and when to do them? This is a great strength of Reliability Centered Maintenance (RCM). RCM helps us to identify the right maintenance to do and how often to do the maintenance tasks. For example, should a Scheduled Replacement task or a Condition Based Maintenance be implemented? Join me as I share how RCM can help us develop the right Proactive Maintenance so we can achieve the Reliability we need.

[Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

by Bryan Christiansen Leave a Comment

4 Ways Of Cutting Maintenance Costs That Won’t Impact Asset Reliability

4 Ways Of Cutting Maintenance Costs That Won’t Impact Asset Reliability

Physical assets require continuous maintenance throughout their useful lives. That makes allocating and tracking maintenance expenses a necessity for companies. Maintenance cost is any expense that facilities incur while keeping assets in good working conditions. Typical maintenance costs include:

  • Amount spent for procuring spare parts or replacement components.
  • Cost of purchasing or leasing maintenance tools.
  • The amount for procuring and maintaining digital maintenance tools.
  • Wages for maintenance staff.
  • Costs associated with inventory management.

[Read more…]

Filed Under: Articles, CMMS and Reliability, on Maintenance Reliability Tagged With: Maintenance program

by Sanjeev Saraf Leave a Comment

Building Facility Siting: Relocate, Replace, Or Reinforce?

Building Facility Siting: Relocate, Replace, Or Reinforce?

Process and portable building siting has attracted further interest following the BP Texas city incident. Because of the proximity of office buildings to chemical processes, it is likely that people inside of a building be subjected to higher risks from process hazards than outdoor personnel.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Robert (Bob) J. Latino Leave a Comment

Why Production, Maintenance & Reliability Are Critical to Each Other’s Success

Why Production, Maintenance & Reliability Are Critical to Each Other’s Success

Author: Mark Latino

Oftentimes, Production may not know the value of using Reliability tools such as Opportunity Analysis (OA) and Root Cause Analysis (RCA) to gain more consistent predictable production runs.

Most production leadership has never spent time in Maintenance and/or Reliability roles; therefore, they see a different big picture. The pieces of the big picture are interconnected like a puzzle and most production people see the puzzle assembled one way, while the Maintenance and Reliability people see the puzzle assembled another way.

[Read more…]

Filed Under: Articles, on Systems Thinking, The RCA

by JD Solomon Leave a Comment

Five Ways to More Effectively Facilitate Root Cause Analysis

Five Ways to More Effectively Facilitate Root Cause Analysis

This article discusses five ways to facilitate root cause analysis (RCA) more effectively through conducting pre-session exchanges, asking powerful questions, using exercises that engage, anticipating disruption, and controlling the tempo. Root cause analysis requires systems thinking because most failures involve a is a collection of interrelated or interacting parts, including physical equipment, humans, and interactions.


Facilitation is defined as a structured session(s) in which the meeting leader (the facilitator) guides the participants through a series of predefined steps to arrive at a result that is created, understood, and accepted by all participants.” The fundamentals of good facilitation as provided in the definition are always essential, including having a structure that includes predefined steps and arriving at results that are created, understood and accepted by all participants.

Facilitating Root Cause Analysis

[Read more…]

Filed Under: Articles, Communicating with FINESSE, on Systems Thinking

by James Reyes-Picknell Leave a Comment

Insurance: Are you Really Covered?

Insurance: Are you Really Covered?

Another conspiracy theory debunked. Your business has various insurance coverages including business continuity. You pay quite a hefty premium for that coverage so you believe you are covered. But are you really?

[Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by Greg Hutchins Leave a Comment

Subcontractor Risk is a Major Reason for Project Failures

Subcontractor Risk is a Major Reason for Project Failures

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Studies show that the majority of companies today outsource up to 60-70% of their work scope to subcontractors to stay competitive. As a result, subcontractors are a major source of risk to a project.

How to minimize the subcontractor risk on a project is addressed in this paper. The approach to do this is based on my 30 years of project and project risk management experience and knowledge.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

How to Calculate Replacement Asset Value for Assets and Equipment Purchased in Foreign Currency

How to Calculate Replacement Asset Value for Assets and Equipment Purchased in Foreign Currency

When calculating the replacement asset value fo items brought overseas, factor the effect of the difference in exchange rate into the calculation.

Ahmed asks:

How can we calculate replacement asset value (RAV) of a plant? We have 100’s of equipment in our three plants and we cannot contact 100’s of Vendors to tell us today’s equipment value. We have only the Capitalization Cost or installed historic value of assets.

The oldest plant was installed 6 yrs back (Aug 2015) for a total plant or asset value in our accounting record of 10 MMPKR. When the plant was installed 1 USD = 100 PKR and now after 6 yrs the exchange rate is 1 USD = 172 PKR. We took the capitalization cost of 10 MMPKR and calculated replacement asset value at today’s worth as 10 * 172/100 MMPKR.

[Read more…]

Filed Under: Articles, Life Cycle Asset Management, on Maintenance Reliability

by Larry George Leave a Comment

Credible Reliability Test Planning

Credible Reliability Test Planning

How to allocate subsystems’ MTBF requirements with testing? Name-withheld-to-protect-the- guilty proposed “Top-Down” reduction in subsystem MTBF requirements; the more subsystems (in series) that you test, the lower the subsystem required MTBF! “The correct formula is

1/MTBF(subsystem requirement) = 1/MTBF(system requirement) –
((# of subsystems in series – # of subsystems tested)/MTBF(subsystem).”

This “Top-Down…” method is uncited and not found in Internet search. 

[Read more…]

Filed Under: Articles, on Tools & Techniques, Progress in Field Reliability?

by Ray Harkins Leave a Comment

Understanding the Binomial Distribution

Understanding the Binomial Distribution

Coauthored with Mark Fiedeldey

The binomial distribution is a discrete distribution useful for estimating the probability of success or failure when these are the only two possible outcomes. Thus, the prefix, “Bi”. Understanding the binomial distribution — how it’s used and under what conditions – is therefore a valuable analytical tool for reliability engineers.

[Read more…]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

by Sanjeev Saraf Leave a Comment

Using Thermal Analysis to Identify Reactive Chemicals

Using Thermal Analysis to Identify Reactive Chemicals

Reactivity hazards involve conversion of stored chemical energy of the components into mechanical or heat energy, andit is the uncontrolled release of this stored energy that causes the damage in a reactive chemical incident. The reactivity of a substance is normally assessed by performing calorimetric measurements.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Karl Burnett Leave a Comment

The Hills Are Alive With The Sound of Maintenance: The Whitehead Torpedo

The Hills Are Alive With The Sound of Maintenance:  The Whitehead Torpedo

British engineer Robert Whitehead began his career producing textile weaving machinery in France. In 1856 he moved to the Adriatic coast to manufacture marine steam engines. He met Giovanni Luppis, an Austro-Hungarian navy officer, who had been developing a self-propelled coastal defense weapon that could be floated into an enemy fleet. Together, they failed to develop a practical weapon. Whitehead remained fixed on the idea of a submerged, self-propelled weapon. Working on his own for two years, Whitehead developed the modern torpedo. He sold his first units to the Austro-Hugarian Navy in 1867.

[Read more…]

Filed Under: Articles, History of Maintenance Management, on Maintenance Reliability

by Doug Lehr Leave a Comment

Exceeding Expectations

Exceeding Expectations

Your team knows what Operation Within Specification (OWS) is for its product. This is the set of performance limits confirmed in the laboratory using API product standards. These limits help establish the ratings for parameters such as pressure, mechanical load, operating temperature, and other parameters found in operating manuals.

[Read more…]

Filed Under: Articles, Equipment Risk and Reliability in Downhole Applications, on Risk & Safety

by Robert (Bob) J. Latino Leave a Comment

Fact or Myth #1: All ‘RCA’ Thinking is Linear

Fact or Myth #1: All ‘RCA’ Thinking is Linear

In my travels over the past 35+ years talking to RCA analysts around the world, as well as those outsiders who look into our ‘RCA’ bubble, I find many misconceptions about RCA. This happens in every space, just think about RCM, RBM, APM, CBM and the like; everyone experiences how other people view their craft.

[Read more…]

Filed Under: Articles, on Systems Thinking, The RCA

by JD Solomon Leave a Comment

Total Filth Ahead In Act II of Communicating with FINESSE

Total Filth Ahead In Act II of Communicating with FINESSE

In a recent article, I shared that every written or verbal communication needs a structure. Aristotle believed that every poem or theatrical performance should follow a three-act structure. The three-act structure stands the test of time in all forms of writing and performing arts. It is also a straightforward and extremely efficient structure. More importantly, it works subtly but effectively with our human thinking processes.

The three-act structure is alive and well in the series “Communicating with FINESSE” on Accendo Reliability. Act One – the Opening – frames what is to come in Act II and lays the foundation of Systems Thinking needed for effective communications. Check out the building story of Act One in these articles: The One Thing Your Approach to Communication & Facilitation is Missing, Effective Communication Is The #1 Thing That Changes Your Life, and Do You Know These Dirty Secrets of Effective Communication? 

[Read more…]

Filed Under: Articles, Communicating with FINESSE, on Systems Thinking

  • « Previous Page
  • 1
  • …
  • 81
  • 82
  • 83
  • 84
  • 85
  • …
  • 251
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Leadership Values in Maintenance and Operations
  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy