Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles

Articles

Find all articles across all article series listed in reverse chronological order.

by Fred Schenkelberg 3 Comments

Hypothesis Tests for Proportion

Hypothesis Tests for Proportion

This is also called the “p test”

When comparing proportions that are from a population with a fixed number of independent trials and each trial has a constant probability of one or another outcome (Bernoulli experiments) then we can use a p test. p is the probability of success, and 1-p is the probability of failure. Caution: stay consistent once you define success otherwise, like me, you’ll have a bit of confusion. n is the number of trials. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Hypothesis testing

by Fred Schenkelberg Leave a Comment

Reliability Goals

Reliability Goals

The target, objective, mission or goal is the statement that provides a design team with focus and direction. A well-stated goal will establish the business connection to the technical decisions, related to product durability expectations. A well-stated goal provides clarity across the organization and permits a common language for discussing design, supply chain, and manufacturing decisions.

Let’s explore the definition of a ‘well-stated reliability goal.’ First, is it not simple MTBF, “as good as or better than…” or ‘a 5-year product’. These are common ‘goals’ found across many industries, yet none permit a clear technical understanding of the durability expectations for the product.
The common definition for reliability is [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Reliability goal setting

by Fred Schenkelberg 12 Comments

K Out of N

K Out of N

The design of a product includes the arrangement of all of the product elements. When considering the reliability of a system, the arrangement matters. Many systems are arranged serially. This means that with the failure of any one element, the system will not work. See the article on Series Systems for more details. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Modeling and Predictions Tagged With: Exponential distribution, Reliability Block Diagram (RBD)

by Fred Schenkelberg 2 Comments

HALT Value

HALT Value

It’s always necessary to estimate the value of specific reliability activities. It is needed to justify the investment required to accomplish the task. Prototypes, diagnostics equipment, and environmental chambers are expensive. The difficulty is an inability to know what will be found, before conducting the experiment.

Not doing the test means the certainty of not finding anything. That is often not enough motivation to invest, to learn something about the reliability performance. The following scenario is just one situation, along with a few ideas to help you estimate the value of investments in reliability work. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Highly Accelerated Life Testing (HALT), Value

by Richard Coronado Leave a Comment

Design of Experiments

Design of Experiments

Design of Experiments (DoE) and the Analysis of Variance (ANOVA) techniques are economical and powerful methods for determining the statistically significant effects and interactions in multivariable situations. DoE may be utilized for optimizing product designs, as well as for addressing quality and reliability deficiencies. Within the DoE framework, the practitioner may explore the effects of a single variable or analyze multiple variables. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Analysis Of Variance (ANOVA), Design of Experiments (DOE)

by Richard Coronado 3 Comments

FRACAS

FRACAS

The Failure Reporting and Corrective Action System (FRACAS) is a closed-loop process whose purpose is to provide a systematic way to report, organize and analyze failure data. Implementation of a FRACAS has increasingly become commonplace within an industry. The requirement for implementation of some type of FRACAS within a DoD program was first established in 1985 with MIL-STD-2155. However, in 1995 that standard was reestablished with no changes to content as a handbook, MIL-HDBK-2155, and was recommended as guidance. Today, multiple software solutions exist that provide all the functionality required of a FRACAS. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Data Collection and Use Tagged With: Failure Reporting Analysis and Corrective Action System (FRACAS), Root Cause Analysis (RCA)

by Richard Coronado 1 Comment

Reliability Allocations

Reliability Allocations

After the system has been drawn in block diagram form, subsystem and component reliability goals and targets are established. This is a common practice in the development of complex systems, particularly when different design teams or subcontractors are involved. Reliability allocation involves setting reliability objectives for components or subsystems in order to meet a system reliability objective and should occur in the initial stages of design or prior to designing major system upgrades. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Reliability apportionment (allocation)

by Fred Schenkelberg Leave a Comment

Types of Risk

Types of Risk

Creating a product or maintaining equipment is actually about our ability to manage risk. The various risks are outlined below, and there are more to consider. This summary covers the basics related to reliability. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Management Tagged With: Product development

by Fred Schenkelberg 3 Comments

Derating Value

Derating Value

This example is based on a real situation. After a class on design for reliability, a senior manager declared that every component would be fully derated in every product (electronic test & measurement devices). Within a year the design team redesigned all new and existing products, with strict adherence to the derating guidelines provided in the class. A year after the class the product line enjoyed a 50% reduction in warranty claims. They learned about derating and a manager saw the potential value. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Derating, Failure Rate

by Fred Schenkelberg 2 Comments

Program Elements Part 2

Program Elements Part 2

This is a two part series where I outline the basic elements of creating and supporting a reliability program. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Management Tagged With: Reliability program

by Fred Schenkelberg 3 Comments

ALT Value

ALT Value

Here is an example of how to determine the future value of a specific reliability task. Many of us face the challenge of how to justify spending product development resources to provide insights and information to the rest of the team. Accelerated life testing (ALT) is particularly difficult: It is time consuming, expensive, and at times statistically complex. Having a clear method to estimate the value serves your career and the organization well, as both benefit from the right investments.

[Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Life testing and accelerated life testing (ALT), Value

by Fred Schenkelberg 2 Comments

Reliability Knowledge

Reliability Knowledge

A recent forum post included the notion that many engineers and managers developing products or maintaining equipment have knowledge apathy concerning reliability. “They don’t care!” was the poster’s words. Has this happened? Have we lost the ability to care about reliability?

Reliability Understanding

In a course I teach on reliability engineering management I ask my students to find an advertisement using reliability as a central theme or claim. This isn’t very hard to do, and I’ve regularly been surprised at the range of uses advertising finds around the concept of reliability. ‘Reliable Movers’ claims to reliably and safely move your belongings to your new home. A reliable shotgun ammunition-loading device suggests each shell will fire reliably. And, many other advertisements use the basic concepts of consistent, repeatable, safety, and trustworthy via the term reliable or reliability. There is a common and good association with reliability. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by Fred Schenkelberg Leave a Comment

Program Elements Part 1

Program Elements Part 1

This is a two part series where I outline the basic elements of creating and supporting a reliability program.

Gather Requirements and Set Reliability Goals

[Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Management Tagged With: Reliability program

by Fred Schenkelberg 1 Comment

Reliability Management Terminology

Reliability Management Terminology

For Reliability Engineers to converse with one another and with non-technical people in an organization, it is necessary for the language of reliability to be widely understood. These terms form the backbone of a working vocabulary and should be well understood by Certified Reliability Engineers.

Availability: Fraction of time that a system is usable. Steady state Availability = MTBF/(MTBF+MTTR) [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Management Tagged With: Technical writing

by Fred Schenkelberg Leave a Comment

Reliability Predictions

Reliability Predictions

If only we had a crystal ball or another device to predict the future. From the general wondering about the enemies next move, to the soldier hoping their equipment will work. In the corporate boardroom estimating the competitions next move, to the maintenance manager ordering spare parts, we have many uses for knowing the future.

We often look to past performance to provide an indication of the future. Has this mutual fund regularly provided adequate returns? If so, we predict it will going forward. And anyone that has reviewed mutual fund performance also has read or heard the admonishment to not use past performance to estimate future returns. Mutual funds, markets, business and battlefields all change and respond in sometimes unforeseen ways. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Parts count prediction

  • « Previous Page
  • 1
  • …
  • 243
  • 244
  • 245
  • 246
  • 247
  • …
  • 251
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy