Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles

Articles

Find all articles across all article series listed in reverse chronological order.

by Fred Schenkelberg 2 Comments

Use a Delta Program to Minimize Early Field Failures

Use a Delta Program to Minimize Early Field Failures

Failures happen. Sometimes product failures happen quickly.

You just bought a new feature rich computer and discover it doesn’t work. Right out of the box, it will not power up. Conversations with the tech support and it’s a trip back to the store.

The failures that occur early the in the life of a product tend —

this ‘tend’ really is just a vague ‘in general’

…tend to occur because of manufacturing errors or shipping/installation damage.

Not always, though. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by Fred Schenkelberg 1 Comment

Standby Redundancy, Equal Failure Rates, Imperfect Switching

Standby Redundancy, Equal Failure Rates, Imperfect Switching

First off, switches are not perfect, so this situation includes the reliability of the switch. Switch reliability may be a factor of storage time, probability of actually working when called on to work, or number of switching cycles. Each switch technology may be slightly different. For this equation, you need the reliability or probability of success given the primary unit has failed. Although we are assume the switch reliability is independent of the primary unit reliability and subsequent failure.
[Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Modeling and Predictions Tagged With: Reliability Block Diagram (RBD)

by Fred Schenkelberg 4 Comments

Tolerance Intervals for Normal Distribution Based Set of Data

Tolerance Intervals for Normal Distribution Based Set of Data

This is not the same as a confidence interval. For a mean or standard deviation, we can calculate the likelihood that the true parameter is within a range of values — confidence interval concerning a parameter.

A tolerance interval applies to the individual readings, not the statistics. The interval contains a certain proportion of the values within the distribution of individual data points. The endpoints are tolerance limits. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Tolerance analysis

by Fred Schenkelberg 2 Comments

Reliability Benefits of Alpha and Beta Testing

Reliability Benefits of Alpha and Beta Testing

Your customers are your best testers for your next product. They will explore the features. Expose the product to use conditions in unconscious ways. And, they will let you what they consider failures without needing the specification document.

During the development process, you and team may work to understand what customer may want or expect for the new product. You may even conduct focus groups or review past product field failures and call center records. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by Fred Schenkelberg 13 Comments

Standby Redundancy with Equal Failure Rates and Perfect Switching

Standby Redundancy with Equal Failure Rates and Perfect Switching

First off, switches are not perfect, so this situation is hypothetical. Yet, when you are exploring adding standby redundancy and haven’t sorted out the switching mechanism, you may be purely curious about the benefits of the redundancy. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Modeling and Predictions Tagged With: Reliability Block Diagram (RBD)

by Fred Schenkelberg 2 Comments

Mechanical Systems Reliability Testing

Mechanical Systems Reliability Testing

Mechanical systems wear out and fail eventually. The ability of a structure to support a load, move through the specified range of motion, or spin degrades with use and time. Even our joints eventually wear out.

Accelerated life testing (ALT) has plenty of literature concerning the failure mechanisms unique to electronic components and materials. This is partially due to the limited number of unique electronic components compared to the often custom mechanical designs. ALT also has value as it provides information about a system’s reliability performance in the future.

Let’s explore an example of mechanical reliability testing (an ALT)  in order to outline a basic approach to ALT design and analysis. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Life testing and accelerated life testing (ALT)

by Fred Schenkelberg 3 Comments

Interpolation within Distribution Tables

Interpolation within Distribution Tables

EDITED BY JOHN HEALY

Most statistics books and the CRE Primer have tables that permit you to avoid calculating the probability for common distributions. The normal distribution requires numerical methods to conduct the calculations and would not be feasible during the CRE exam. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Statistics distributions and functions

by Fred Schenkelberg Leave a Comment

Life Estimates Based on Supplier Data

Life Estimates Based on Supplier Data

Suppliers often include reliability information along with performance specifications.

We look for reliability statements as one part of the selection process to ascertain if the component is likely to have sufficient reliability.

When the vendor’s data is clearly stated and meaningful, that information saves us from potentially having to conduct our own reliability evaluations. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Supplier reliability

by Fred Schenkelberg Leave a Comment

Confidence Interval for a Proportion – Normal Approximation

Confidence Interval for a Proportion – Normal Approximation

Edited by John Healy

There are a number of different methods to calculate confidence intervals for a proportion. The normal approximation method is easy to use and is appropriate in most cases.

Clopper and Pearson describe the Clopper-Pearson method also called the exact confidence interval and we’ll describe it in a separate article.

There are other methods, which again will find a description in separate articles. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Confidence interval or bound

by Fred Schenkelberg Leave a Comment

Supply Chain Process Control and Capability

Supply Chain Process Control and Capability

If you buy more than one of an item used in your product, you will have to deal with variability. In general, the variability from part to part is minimal and expected. Occasionally, the variability is large and causes reliability problems. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by Fred Schenkelberg 10 Comments

Confidence Intervals for MTBF

Confidence Intervals for MTBF

EDITED BY JOHN HEALY

As with other point estimates, we often want to calculate the confidence interval about the estimate. The intent is to determine the range of reasonable values for the true and unknown population parameter. For MTBF, this no different.

[Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Confidence interval or bound

by Fred Schenkelberg Leave a Comment

Supplier Reliability Program Maturity

Supplier Reliability Program Maturity

It was late Friday afternoon and the phone rang. Which is rarely a good thing.

There seems to a significant spike in field failures due to one component. The initial failure analysis work reveals the issue started with a batch of parts received about two months ago and the flaw continues to appear in subsequent batches. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Reliability maturity assessment, Supplier reliability

by Fred Schenkelberg 1 Comment

Confidence Interval for Variance

Confidence Interval for Variance

When using a sample to calculate a statistic we are estimating a population parameter. It is just an estimate and the sample due to the nature of drawing a sample may not create a value (statistic) that is close to the actual value (parameter). [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Confidence interval or bound

by Fred Schenkelberg Leave a Comment

Reliability Specifications and Requirements

Reliability Specifications and Requirements

The communication between suppliers or vendors and their customers is often using a mix of specifications and requirements.

Customers set requirements and suppliers offer specifications. When they match, or when a supplier component specifications meet the customer’s requirements, we have the potential for a transaction. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by Fred Schenkelberg Leave a Comment

Chance of Catching a Shift in a Control Chart

Chance of Catching a Shift in a Control Chart

Control charts help us monitor and stabilize a process. A little graphics along with statistics provides a tool to identify when something has changed. Some changes are abrupt and obvious, other a little more subtle, yet the out of control signals each have approximately the same chance of alerting us to a change.

A little graphics along with statistics provides a tool to identify when something has changed. Some changes are abrupt and obvious, other a little more subtle, yet the out of control signals each have approximately the same chance of alerting us to a change. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Statistical Process Control (SPC)

  • « Previous Page
  • 1
  • …
  • 228
  • 229
  • 230
  • 231
  • 232
  • …
  • 251
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Leadership Values in Maintenance and Operations
  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy