Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles

Articles

Find all articles across all article series listed in reverse chronological order.

by Greg Hutchins Leave a Comment

Risk Assessment: What Future are you Planning for?

Risk Assessment: What Future are you Planning for?

Guest Post by Geary Sikich (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Introduction 

There exists an overabundance of guidance for conducting risk assessments. Yet, it seems that we still have difficulty in getting risk assessments to reflect the appropriate level of concern for the identified risks that we are assessing. We also tend to view risk in relation to the place where we are employed and the industry that we work in. When we look at risk assessment from this perspective it should be clear that we are missing the point precisely, or at best, are being too narrowly focused, when it comes to assessing risk for our organizations. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

Open Trickle Chutes for Damp Bulk Product

Open Trickle Chutes for Damp Bulk Product

What readers will learn in this article:

  • The flow of bulk materials through chutes is affected by internal properties of the bulk product.
  • Friction exists between the chute walls and a moving product.
  • Momentum and velocity must be maintained when running bulk
    materials through chutes.
  • Bulk materials chute design and use considerations.

For the effective flow of a cohesive (sticks to itself) product, a chute must be designed to maintain momentum & velocity. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Fred Schenkelberg 1 Comment

DFX as an Approach

DFX as an Approach

When products were crafted one at a time, the design and manufacturing process was often done by the same person. The craftsman would design and build a chest of drawers or carriage.

Some trades would employ apprentices to learn the craft, which included design. Larger projects may include an architect or lead designer along with a team of engineers.

Yet the shop or site for the railroad engineer or bridge was not far allowing close communication between the ironsmith and design team. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Design for X (DFX)

by Fred Schenkelberg Leave a Comment

5 Steps to Building a Reliability Culture

5 Steps to Building a Reliability Culture

Reliability is not the sole responsibility of the reliability engineer but results from nearly everyone in an organization making decisions that move toward the desired product reliability performance.

As a reliability professional, I often find it necessary to explore ways to leverage my knowledge of these areas to change the culture within an organization to create a sustainable program that achieves reliable products time and again. [Read more…]

Filed Under: Articles, Culture, Musings on Reliability and Maintenance Topics, on Product Reliability

by Fred Schenkelberg Leave a Comment

Descriptive Models of the Design Process

Descriptive Models of the Design Process

I’ve often said, “reliability occurs at the point of decision.”

At the point of design during the design process. At each and every decision.

The design team of engineers establishes the bulk of the reliability capability early in the design process. The team’s decisions about materials or shape, concerning inventions or outsourcing, about how and where to build the product, and many more decisions impact the final product’s reliability performance.

Reliability is designed into the product right from the start. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Design for X (DFX)

by Mike Sondalini 2 Comments

Changing the Service Duty of a Pump

Changing the Service Duty of a Pump

What readers will learn in this article.

  • Centrifugal pumps can be moved to a new service.
  • The impeller size, impeller speed, and motor power need to match the new service.
  • That Similarity Law formula is used in calculating the new impeller size, speed, and motor power.
  • Introduction to centrifugal pump curves and their use.

When there is a need to determine a new service duty for a centrifugal pump, and no performance curves are available, the recommended method is to use the Similarity Laws. These laws are derived by the use of [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Fred Schenkelberg Leave a Comment

Show me the Data

Show me the Data

Early in my career, I worked for an unreasonable person.

He wanted us, his engineering staff, to show him the data. He wanted us to gather, monitor, analyze and display data regularly. Anytime we needed approval, funding, or resources he wanted to see the data. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Data analysis, Statistics concepts

by Kirk Gray 4 Comments

You May Often be Exceeding Operating Specifications!

You May Often be Exceeding Operating Specifications!

HALT (Highly Accelerated Life Test) requires exceeding specifications

One aspect of HALT, (a test to find weaknesses and reliability risks empirically), is the difficulty for many engineers that are new to the HALT- that it guarantees that the maximum or recommended operating environmental specifications for the system and components under test will be exceeded, and failures beyond spec are potentially relevant to field reliability. [Read more…]

Filed Under: Accelerated Reliability, Articles, on Product Reliability Tagged With: Highly Accelerated Life Testing (HALT)

by Fred Schenkelberg Leave a Comment

Understanding the Design Process

Understanding the Design Process

Let’s start by understanding the difference between engineers and engineering designers.

The work we do as reliability engineers may require a different approach when working with these different types of engineers. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Design for X (DFX)

by Fred Schenkelberg 4 Comments

The System Effectiveness Concept

The System Effectiveness Concept

Reliability is not the only concern when building a system.

Let’s consider a passenger car. Reliability refers to how often the car in the shop. How often we need to perform preventative or corrective maintenance. How often it fails. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: System Effectiveness

by Kirk Gray Leave a Comment

Required Case History for Reliability Engineers

Required Case History for Reliability Engineers

One for the (Reliability) Books

The GM Ignition switch failure case history should be required reading for all reliability engineers.

It is rare to have insight into any internal company history of serious electronic and electromechanical failures. Failure analysis and the causes of electronics or electromechanical systems failure can be a difficult investigation for any manufacturing company. Disclosure of the history and data is rarely if ever published due to the potential liability and litigation costs as well as loss of reputation for reliability and safety.

[Read more…]

Filed Under: Accelerated Reliability, Articles, on Product Reliability Tagged With: Field data analysis

by Fred Schenkelberg Leave a Comment

Design for Assembly

Design for Assembly

The ability to assemble a system to meet the functional requirements is constrained by the design, the materials, and the tolerances.

Some designs are impossible to assembly. While other designs take little effort to build. The discipline of design for assembly, DFA, applied during the design process can enhance the manufacturing process. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Design for X (DFX)

by Fred Schenkelberg 2 Comments

The Environmental Test Manual

The Environmental Test Manual

Let’s say you run across a lightweight, inexpensive, easy to manufacture metal that you are considering for a new bike frame. Beyond the functional considerations of strength, size, and finish options what else do you consider?

Is it durable? If it fails how does it fail (a shattering a bicycle frame would not be good, for example). You may also consider how the bicycle will be used and stored. What stress will the frame experience over its lifetime? [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by Greg Hutchins Leave a Comment

How Six Sigma Can Help You?

How Six Sigma Can Help You?

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Six Sigma is a powerful tool used to solve a problem or improve a process. The company (one of the 4 big defense companies) I worked for over 20 years lived, breathed and ate it every day. I became a six sigma specialist. For those readers not familiar with six sigma, I offer the following example to hopefully provide some insight into how it works and the benefits it offers.   [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Fred Schenkelberg 2 Comments

General Human Factors Design Principles

General Human Factors Design Principles

People build, transport, use, maintain and dispose of equipment or products.

Thus the creation of these items should include consideration of the humans involved. In order to fully benefit from the functional capability of an item or system, we, as humans, have to interact with an item’s interface, displays, sounds, etc.

Whether a smartphone or bottling machine, the ability to provide commands or direction, the ability to recognize and understand responses, and the ability to correctly identify faults or outputs all combine to permit humans to place calls or fill juice bottles.

It is in the design stage that the elements of a piece of equipment (hardware or software) thwart or enable efficient human interaction. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development Tagged With: Human factors analysis

  • « Previous Page
  • 1
  • …
  • 222
  • 223
  • 224
  • 225
  • 226
  • …
  • 251
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy