Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles

Articles

Find all articles across all article series listed in reverse chronological order.

by Adam Bahret Leave a Comment

Seminar: HALT Techniques and connecting to program objectives

Seminar: HALT Techniques and connecting to program objectives

This is the third session from the Annual Apex Ridge Reliability Seminar held in Boston.

In this session, I discuss the methodology of HALT and how to connect it with program tools and objectives.

The philosophy of HALT is often misunderstood simply due to its name and acronym, “Highly Accelerated Life Testing” (HALT).

It is not an accelerated life test, it’s really not even a test. HALT is a process of increasing stress on a design to induce failures for the purpose of learning about the design and improving its robustness.

It’s a discovery process. [Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability Tagged With: Highly Accelerated Life Testing (HALT)

by Fred Schenkelberg 2 Comments

The Connection of Reliability and Customer Expectations

The Connection of Reliability and Customer Expectations

Customers Experience Product Reliability in Real Time

In a customer’s mind, the product works or it doesn’t. If it doesn’t work as expected it has failed. This may or may not be a reliability problem.

A customer or someone using your product brings a set of expectations to the experience. The range of expectations may range from very little to very high functioning, value production, and durability.

Failures are defined by customers.

In part, this is the functional capability, the operating within specifications, and the durability. The customer’s definition of reliability may or may not follow the design specifications.

It is the comparison of what should happen to what does happen. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Management Tagged With: Customer and market analysis

by Kevin Stewart Leave a Comment

What Do You Do with Your Reliability Opportunity?

What Do You Do with Your Reliability Opportunity?

The Opportunity

Here is a diagram I generated when I was in the reliability group at my facility.

It came about because I was trying to identify why we may not be showing the value that was expected from the reliability improvement work we were doing. [Read more…]

Filed Under: Articles, on Tools & Techniques, Reliability Reflections Tagged With: Maintenance program

by Doug Plucknette 1 Comment

Safety Is a Lifestyle

Safety Is a Lifestyle

Something to think about in a day and age when most companies post their mission, vision, and goals on the company web page.

Do we really stand behind these statements and demonstrate the behaviors that clearly show we are willing to do what it takes to create a safe workplace?

If you have ever questioned this, consider two questions I ask RCM Teams as we analyze failure modes that impact health, safety, and environment: [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Fred Schenkelberg Leave a Comment

Use and Environmental Profiles

Use and Environmental Profiles

Use and Environmental profiles

Did you know that hot air doesn’t rise when there is no or very little gravity?

The electronics used to steer an oil exploration drill head 5 miles deep in the earth experiences 200°C sulfuric acid immersion along with continuous 50,000G shocks.

I used to think the environment under the hood a car was difficult. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by James Reyes-Picknell Leave a Comment

Linking RCM Facilitation with Effective Maintenance Program Implementation

Linking RCM Facilitation with Effective Maintenance Program Implementation

Most of us would agree that there is a new global economy being forged right now in the manufacturing sector.

Inevitably, this translates to a renewed focus on transferring more business value to the customer. Central to this will be linking RCM (Reliability Centered Maintenance) facilitation with effective maintenance program implementations.

In short, the difference between what we, as RCM Facilitators, have been doing in the past and what we will be doing from now on is: a strong emphasis on what tactics are required in order to achieve the failure management strategies an RCM Team defines.

That is, we will conduct the decisions phase of the analysis somewhat differently. (i.e. The 3rd pass through when walking-the-dog in an RCM analysis) [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability Tagged With: Maintenance program, Reliability Centered Maintenance (RCM)

by James Kovacevic 1 Comment

The Black Hole of Maintenance

black hole image
Photo by Steve Jurvetson

Where Maintenance Requests Go But Never Appear to Escape From- the Backlog.

This is exactly what some operations staff think of when we tell them to submit a work request.

It means that they do not think that the work will be completed, or it will after it no longer matters to them.

What if you called the cable company and reported an issue? You would expect prompt service, and would expect that you would not have to chase them down to do the work correct? Maintenance is a service organization that enables the successful operation of the business.

The business shouldn’t have to chase us down or wonder if we will repair the equipment. [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Maintenance planning

by Adam Bahret Leave a Comment

Seminar: Reliability Testing Outputs as Program Inputs

Seminar: Reliability Testing Outputs as Program Inputs

This is the second session from the Annual Apex Ridge Reliability Seminar held in Boston.

The session focus was how to best use specialized testing technique outputs as effective program inputs. There are simple steps for hooking the information from the test data into the correct program management decision points.

Very often opportunities are missed in programs by aligning testing outputs with incorrect program phases. [Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by Greg Hutchins 2 Comments

Basics: Project Risk Management

Basics: Project Risk Management

Basics: Project Risk Management

Guest Post by Rod Farrar (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The project management body of knowledge generally focuses on scope management, time management, and cost management. Risk management generally comes in at about 8th place out of the ten.

However, risk management is potentially the biggest part of the project management planning process.

Often organizations assign resources, dollars and time to project objectives to know exactly when the project is going to finish, how much it is going to cost and what resources are needed.

The problem with doing this is they have not identified risks. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety Tagged With: Risk management process

by Mike Sondalini 1 Comment

Job Descriptions Tell Tradesmen What to Do

Job Descriptions Tell Tradesmen What to Do

Abstract

The first words a maintainer will read when they pick up a work order is the job description. The job description must tell him enough information about the work so he can understand what to do.

Keywords: CMMS, computerized maintenance management system, planning, breakdown repair, corrective.  [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance Tagged With: CMMS

by Fred Schenkelberg Leave a Comment

Performing the Right Corrective Action

Performing the Right Corrective Action

Performing the Right Corrective Action

When something doesn’t work as expected, it is a failure. A common response to a failure by an organization is to restore the system or remedy the situation.

Each failure is unique to the product, industry, customer situation, expectations, etc. Selecting the appropriate response or corrective action when confronted with a failure may or may not be obvious.

Selecting the right corrective action depends on the business and legal factors, along with customer expectations.

For a given failure, thinking through the range of possible responses and selecting the right one takes care to meet the various stakeholder’s requirements or expectations. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability in Design and Development

by Kevin Stewart Leave a Comment

What is the Goal Of a Reliability Initiative?

What is the Goal Of a Reliability Initiative?

Change happens slowly

The goal of a reliability initiative is to save money, not to “install” a system.

If that is not your current goal, then how did it get changed?   Change sometimes happens slowly, so slowly that we don’t notice it.

I’m reminded of a fable about a camel and a Bedouin.  It is cold outside and the [Read more…]

Filed Under: Articles, on Tools & Techniques, Reliability Reflections

by Fred Schenkelberg 2 Comments

The Environmental and Use Manual

The Environmental and Use Manual

Environmental and Use Manual

How well can you describe the use conditions your product will experience?

How well do you need to know the use conditions?

For some situations, the environment for your product is assessable, others are not. For some situations, we guess the range of expected stresses, others we measure.

The design process and the myriad decisions that impact product reliability rely on characterized environmental stresses.

A great place to consolidate how and where customers will use your product (including the relevant stress factors) is in an environmental manual. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Environmental test manual, Environmental testing

by Doug Plucknette Leave a Comment

Engaging Your Workforce

Engaging Your Workforce

Engagement

A word that has several meanings- most think of an upcoming wedding, a young couple excited about the idea of getting married, starting a home and a family together and all the exciting things that come with being in love.

But this isn’t the kind of engagement I want to talk about today. [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by James Reyes-Picknell Leave a Comment

Searching for Quick Fixes Now Leads to Problems Down the Road

Searching for Quick Fixes Now Leads to Problems Down the Road

I want it now and I want it cheap! Oh – and I don’t want to do any work for it.

When it comes to information, entertainment, finding your way around and communications these days, we more or less literally have it all at our fingertips and available to us just about anywhere.

We can even order and pay for coffee to pick up on our way from the commuter train to the office – no lineups for delays. We can book hotels, airlines and rental cars at the touch of our fingers with apps that show us the cheapest options.

We live in a world where instant gratification is a reality in many aspects of our private lives.

Consumer electronics has transformed a great deal of business – basically, anything where there is a service or goods that a consumer might buy on their own, we can get it easily and immediately.

We’ve grown used to instant gratification in much [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

  • « Previous Page
  • 1
  • …
  • 205
  • 206
  • 207
  • 208
  • 209
  • …
  • 251
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy