Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles

Articles

Find all articles across all article series listed in reverse chronological order.

by Doug Plucknette Leave a Comment

The 5 Worst Inventions Ever!

The 5 Worst Inventions Ever!

Something to Make You Smile on a Monday!

Something light to read on a Monday afternoon.

I’m beginning think that one of the worst side effects of growing older has nothing to do with the fact that you are not as active as you should be, but that you spend that time where you should have been walking, running, riding a bike or chasing the kids thinking about crap that might have little significance to the rest of the world. [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by James Kovacevic Leave a Comment

3 Ways to Improve Profitability with a Criticality Analysis

3 Ways to Improve Profitability with a Criticality Analysis

Making the criticality analysis work for you and drive improvements in the maintenance strategy

Most manufacturers do not have an up to date criticality analysis and those that do have one, do not use it to drive decisions. Having a criticality analysis facilitates improved decision making and prioritization within the site and business.

How many times are there debates regarding which work needs to be done, which PMs will be dropped from the schedule because the planned downtime was reduced? These debates occur regularly, but to not have to occur. A criticality analysis drives improvements in the business by: [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Capital Asset Management: Setup part 3

Capital Asset Management: Setup part 3

What is added to the capital investment?

Your upfront capital investment must go beyond engineering, procurement and building costs. Additional activities that will need to be done that fit within the 2 – 3 % of capital cost figure are:

RCM analysis on the new design (preferably at both concept and detailed design phases so you can incorporate design change recommendations easily) [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by Adam Bahret Leave a Comment

Design of Experiments, Testing Compression and the Opportunity to Identify Interactions

Design of Experiments, Testing Compression and the Opportunity to Identify Interactions

Design of Experiments (DOE) is a phenomenal way to identify key relationships between variables and effects.  It fully leverages statistics to not only identify these relationships in a compressed time frame but any “interactions” between variables that cause a specific effect.  These interactions would not have been observed if experimentation was limited to adjusted one factor at a time (OFAT).

[Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by Greg Hutchins Leave a Comment

Could Your Pacemaker be Hacked?

Could Your Pacemaker be Hacked?

Guest Post by Paul Kostek (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Hack a pacemaker?  Is this a real problem?

Some recent experiments have been able to hack a pacemaker and other medical devices including an insulin pump.  The weakness of these systems was the analog sensors attached to the body to gather information. These analog inputs bypass the internal security and are converted directly to digital signals. 

From a risk perspective is this something medical device manufacturers , insurance companies and the medical professionals need to worry about? It was part of a conversation at the Black Hat @Design West Conference where considerable discussion was held on building defensive walls. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

How to Trick Operators (and everyone else)

How to Trick Operators (and everyone else)

What readers will learn in this article.

  • Operators cannot second-guess plant designer’s intent.
  • The plant designer is responsible of successful plant
    operation.
  • Operators need true indications of plant conditions to
    make the right decisions.
  • Select and locate sensors that provide foolproof
    indication of plant operational status.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Fred Schenkelberg 3 Comments

Metal Fatigue Failure Mechanism Accelerated Life Testing

Metal Fatigue Failure Mechanism Accelerated Life Testing

Metal is a wonderful, strong, material. Yet under certain types of stresses metal can fail One in particular is fatigue due to cyclic motion.

Metals in a solid state have an atomic level lattice structure. This provides the strength and flexibility. It is the flexibility part that causes trouble. We don’t get the benefit of flexibility for free. As the metal bends it ‘adjusts’ the lattice to accommodate the motion. In doing so, it changes the metal properties becoming a bit more brittle, for example.

In most cases a very small motion causes imperceptible changes and loss of functionality. In some cases, like bending a wire coat hanger with the intent to break it, just a few cycles of dramatic bending is enough to break the wire.

In metal applications that experience cyclic motion and the risk of metal fatigue failure may occur during the expected duration of product use, we may need to characterize the time to failure behavior. An accelerated life test for a metal fatigue failure mechanism is not difficult, yet does take some planning to get meaningful results. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Doug Plucknette Leave a Comment

Hiring a Consultant? Choose Great Over Good!

Hiring a Consultant? Choose Great Over Good!

A Simple Method To Ensure You Get the Best!

Several weeks ago a customer I worked with back in 2005 called me to ask some questions about a specific Root Cause Analysis process they were using as well as the facilitator they were working with. While I was familiar with the RCA process they were using I admitted to them I had never attended the formal training program offered by the company and while I did know the facilitator I had never seen him facilitate a formal RCA.

My customer then asks me a more difficult question; “Would you recommend we use this methodology as our select supplier for Root Cause Analysis training?” [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Adam Bahret 1 Comment

Prognostics

Prognostics

Engineers have been applying Prognostics to mechanical components for many years.

For example:

  • Motors, increase in current or noise
  • Mechanical pumps, progressive increase in vibration
  • Thermal systems, time to achieve a set temperature
  • Fluid systems, change in pressure

However, most industries building systems with mechanical components choose not to use prognostics because of the cost of the instrumentation within the product. Products that have on board “smarts” can choose to include diagnostics with less effort or expense. With advances in technology, the cost of the instrumentation is dropping. This not only means that adding the hardware to support advanced metrology is more feasible but that many of these components/systems may have already been added for other functionality and controls improvements in the product. It doesn’t take much brainstorming to find creative ways to use these existing sensory systems. [Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by James Kovacevic 1 Comment

What is Criticality Analysis? How Does it Work?

What is Criticality Analysis? How Does it Work?

Understanding the risks allow effective mitigation plans to be put in place

Where is your biggest risk to the site? If you can’t answer that, than your maintenance program is most likely not adequate.   As previously discussed, an effective maintenance program must align with business and its needs. A criticality analysis allows the site to understand where there are risks that must be managed. [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Maintenance program

by James Reyes-Picknell Leave a Comment

Capital Asset Management: Setup — part 2

Capital Asset Management: Setup — part 2

The rest of us are missing the boat!

Check out part 1, too.

RCM has two potential uses – to set you up for success or to regain success from the jaws of failure.
Regardless of when you use it though, RCM alone isn’t enough to get all the benefits. Applying it after the systems are in service, to recover shortfalls in performance, and then failing to follow up on RCM’s results only delivers part of the benefit. That’s where the aircraft and nuclear industries and the military have it right – they take those extra needed steps. The rest of us don’t! [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability Tagged With: Asset management, Maintenance program

by Greg Hutchins Leave a Comment

Space Tourism

Space Tourism

Guest Post by Paul Kostek (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

After writing several articles about topics  related to medical devices and big data, thought I’d explore a new area, risk and space tourism.

Though I will include one interesting note about medical devices, on the October 20th episode of 60 Minutes former VP Dick Cheney admitted that he had the external programming capability for his defibrillator turned off to prevent it from being hacked.  So, even as people question the possibility of this occurring we have a real world example of the steps taken to prevent this from happening.  Think risk mitigation. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

Preventative Maintenance Stops Breakdowns

Preventative Maintenance Stops Breakdowns

Preventative maintenance stops breakdowns. Preventative Maintenance requires people to regularly walk around looking, feeling, listening, smelling (sometimes even tasting) and thinking about their equipment’s operating condition. The three foundations of classical Preventative Maintenance are regular lubrication checks, drive train monitoring and equipment mounting inspections.

Keywords: work order, inspection, watchkeeping, CMMS, computerised maintenance management system. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance Tagged With: Preventive Maintenance (PM)

by Fred Schenkelberg 22 Comments

Temperature & Humidity Accelerated Life Testing

Temperature & Humidity Accelerated Life Testing

Peck’s Relationship

High temperature & humidity is a common test condition. For specific failure mechanisms, there are models available (or you can create a model) to determine the translation from test to use conditions.

These acceleration models generally only apply to one specific failure mechanisms and do not apply to a system level estimate of life. If the failure mechanism is the dominant failure mechanism for the product, then an ALT exploring just that mechanisms would provide a life estimate.

Peck’s relationship is an acceleration model for the effect of humidity on the metallization elements of integrated circuits within plastic enclosures (typically an epoxy over molding).  [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Kevin Stewart Leave a Comment

Characteristic 2 of an RCA Program

Characteristic 2 of an RCA Program

A Plan to Provide Program Resources

Who

Sometimes we get so used to managing without things that it becomes the way things are done. An astronaut giving a presentation at a conference I attended referred to this as “normalization of deviance.” In other words, we get so used to the way things are, that either right or wrong, they become the norm! Unfortunately, the obvious is many times ignored – because it is obvious. If you intend to have a sustainable Root Cause Analysis program, then there are things that must be done. People must be trained, reports must be written, analyses must be performed, and progress must be tracked and reported. Until a program becomes self-sustainable, it must continue to be driven. [Read more…]

Filed Under: Articles, on Tools & Techniques, Reliability Reflections Tagged With: Root Cause Analysis (RCA)

  • « Previous Page
  • 1
  • …
  • 199
  • 200
  • 201
  • 202
  • 203
  • …
  • 251
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Leadership Values in Maintenance and Operations
  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy