
Proper control chart selection is critical to realizing the benefits of Statistical Process Control. Many factors should be considered when choosing a control chart for a given application. These include:
- The type of data being charted (continuous or attribute)
- The required sensitivity (size of the change to be detected) of the chart
- Whether the chart includes data from multiple locations or not
- The ease and cost of sampling
- Production volumes



How often does your facility run out of raw materials? Chances are it is not very often, if ever. Why is this? It may be because the organization has invested heavily in gathering the right data, analyzing and developing contracts for the materials. This prior work ensures a steady supply of materials.







