Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles / on Risk & Safety

on Risk & Safety

A listing in reverse chronological order of articles by:



  • Greg Hutchins (editor) — CERM Risk Insights series

  • Doug Lehr — Equipment Risk and Reliability in Downhole Applications series

  • Sanjeev Saraf — Operational Risk, Process Safety series

by Greg Hutchins Leave a Comment

Future of Quality

Future of Quality

Guest Post by Dianna Deeney (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The current state of the quality profession is affected by shifting business infrastructures and changing definitions of brand quality.

Businesses need to react and change against external pressures like increased frequency of consumer communications, the availability of big data, expanding regulations and standards, and the expectations to innovate quickly. The quality profession is at risk of losing its effectiveness in the overall business operations if it does not proactively change with the business.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf 1 Comment

API 752, 3rd Edition: Changes In Facility Siting Standard

API 752, 3rd Edition: Changes In Facility Siting Standard

The third edition of API 752, “Management of Hazards Associated with Permanent Buidlings” came out in late 2009 and there are a few major revisions to consider.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Greg Hutchins Leave a Comment

Don’t Get Caught Without Your Business Continuity Plans, Again

Don’t Get Caught Without Your Business Continuity Plans, Again

Guest Post by Patrick Ow (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

When the COVID pandemic stuck in March 2020, many organisations struggled with business continuity. Many were caught out without business continuity strategies or plans to overcome the likely business disruption that was brought about by COVID.

Having worked with organisations on their business continuity planning, the key challenge many organisations face in developing their business continuity strategies and plans is the level of business continuity planning and effort required. Many business continuity consultants have adopted the ISO 22301 Business continuity management systems — Requirements approach and have unfortunately over-engineered the approach as a one-size-fits-all.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf Leave a Comment

174 Times And Then KaBoom

174 Times And Then KaBoom

You may have read about the 2007 incident at T2 laboratories  in Florida – the explosion killed four of the company’s 12 employees, injured four other workers and 28 community members.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Greg Hutchins Leave a Comment

5S Workplaces Where Safety and Quality Meet

5S Workplaces Where Safety and Quality Meet

Guest Post by Bill Pomfret (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The five in a 5S workplace organizational and housekeeping methodology refers to five steps – sort, set in order, shine, standardize and sustain. Safety should be the honorary sixth “S.

Many manufacturing facilities have opted to follow the path towards a “5S” workplace organizational and housekeeping methodology as part of continuous improvement or lean manufacturing processes. The term refers to five steps – sort, set in order, shine, standardize and sustain – that are also sometimes known as the five pillars of a visual workplace.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf Leave a Comment

Underwater Oil Plume Formation

Underwater Oil Plume Formation

The following video shows the effect of jet turbulence on underwater plume formation.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Greg Hutchins Leave a Comment

Improving Your Risk Management Framework

Improving Your Risk Management Framework

Guest Post by Peter Holtmann (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

This article is the seventh of fourteen parts to our risk management series. The series will be taking a look at the risk management guidelines under the ISO 31000 Standard to help you better understand them and how they relate to your own risk management activities. In doing so, we’ll be walking through the core aspects of the Standard and giving you practical guidance on how to implement it. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf 1 Comment

The Next Attack

The Next Attack

For the month of September, I thought it would be appropriate to write a post on Terrorism Risks.

Since 2001, there have been an average of 5 attempted terror attacks annually in the U.S. that have resulted in arrests, trial, or raising of the DHS threat level. Now you know what changes the threat level at the airport.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Greg Hutchins Leave a Comment

Enterprise Risk Management and Environmental Risk

Enterprise Risk Management and Environmental Risk

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

In CERM Risk Insights #354 I discussed the risk management study of local governments in New Zealand. One of the cases in the study was Environment Canterbury Regional Council. The regional council’s focus and the increasing concerns about environmental risks by both the public and private sector represents a challenge to the common approach used by most of the New Zealand local governments, ISO 31000:2018 and the International Organization for Standardization (ISO) more generally. This piece discusses this challenge to ISO 31000:2018 and its implications.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf Leave a Comment

High Pressure Gas Cylinders…Relief Valve Failure

High Pressure Gas Cylinders…Relief Valve Failure

The following video desribes 2005 fire/explosion in Praxair’s gas cylinder filling and distribution center. The incident occurred when gas from a pressurized propylene cylinder was released through the relif valve and got ignited.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Greg Hutchins Leave a Comment

Projects Emergencies: Response or Reaction

Projects Emergencies: Response or Reaction

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

In project management we can’t always be in control of the environment around us.  We can only forecast rather than predict risk and despite our ‘reasonable’ or even ‘best’ efforts to mitigate risk; shit happens and emergencies ensue!  It’s not just physical emergencies but also those related to time and cost; remember overbudget or late projects can create an emergency for shareholders and stakeholders alike.

Maybe it’s because we tend to look at the ‘big risks’ or the ‘top ten’ after some semiquantitative assessment but then fail to consider that risks can change with time as more information becomes available.  Or, maybe it is because only those risks that can be clearly defined and are ‘likely’ are communicated to the eyes and ears on the ground.  Those low probability, high impact risks can tend to slip under any risk radar.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf Leave a Comment

Does This Explain Why Hazards Are Missed And Risks Go Unnoticed?

Does This Explain Why Hazards Are Missed And Risks Go Unnoticed?

Take a look at the following video and let me know what you think. 

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Greg Hutchins 2 Comments

Your Suppliers Can Be a Risk to Your Project

Your Suppliers Can Be a Risk to Your Project

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The majority of companies today outsource a major portion (up to 60-70%) of their work scope to subcontractors.  As a result, the subcontractors become a risk to your project because you have no direct control over them. For example, if they start to slip their schedule you cannot direct them to put more assets on the job to pull the schedule back. The other risk that is not obvious is that posed by your subcontractors major vendors or subcontractors. To illustrate this point, this article describes a story that I was personally involved in. 

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf Leave a Comment

Why Inherent Safety Should Be A Part Of Security Regulation

Why Inherent Safety Should Be A Part Of Security Regulation

A few weeks ago [note: written in August 2010], Senator Frank Lautenberg proposed Secure Chemical Facilities Act (S. 3559) to the Senate committee on Homeland Security. The bill mandates Inherent Safer Technology (IST) or Inherently safer design (ISD) at high-risk chemical facilities.

Knowing the uncertainties surrounding the mere definition of  inherent safety, one could say that it is preposterous to mandate IST. IST cannot be regulated and worse it would burden the industry. To a large extent this is true.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Carl S. Carlson Leave a Comment

The Future of Reliability Engineering

The Future of Reliability Engineering

Guest Post by Carl Carlson (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Destiny is no matter of chance. It is a matter of choice. It is not a thing to be waited for, it is a thing to be achieved.” – William Jennings Bryan

The Oxford English dictionary defines “reliability” as “the quality of being able to be trusted to do what somebody wants or needs.”

The textbook definition for “reliability” is “the probability that an item will perform its intended function for a designated period of time without failure under specified operating and environmental conditions.”

In this article, I will share a brief outline of the current and future state of reliability engineering, what works and doesn’t work, and why it matters to all of us.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

  • « Previous Page
  • 1
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • 41
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy