Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles / on Risk & Safety / CERM® Risk Insights

CERM® Risk Insights

by Greg Hutchins Leave a Comment

Searching for Risk in All the Wrong Places

Searching for Risk in All the Wrong Places

Guest Post by Geary Sikich & Sara Robertson (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Much like the song, “Lookin’ for Love in All the Wrong Places” sung by Johnny Lee; risk management professionals need to ask the question “Are we searching for risk in all the wrong places”?  Are risk professionals being deluded or deluding themselves by seeing risk based on media driven analysis; applying outmoded tools, models, etc. that no longer reflect the reality of risk?

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Could a ‘No’ as any other Word be a Positive?

Could a ‘No’ as any other Word be a Positive?

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

What’s in a word?

The right word at the right time can make all the difference between a successful negotiation with an amicable agreement and collaborative banter, or a bitter and twisted tête-à-tête with an entrenched stand-off, raised hackles and, at best, fog-horn diplomacy.  But what is the ‘right word’; unfortunately, it depends on the time and place and people’s personality but one thing is almost certain, if it begins with “n” it is oftentimes not considered to be right and many consider it to be downright wrong.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Bruce Turner – Future of Internal Audit – Howard Wiener Interviewer

Bruce Turner – Future of Internal Audit – Howard Wiener Interviewer

Interview by Howard Wiener of Bruce Turner (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Bruce is an active company director and audit committee chair. He is a well-respected transformational leader with deep and broad professional governance, risk, compliance and audit experience. He was appointed a Member of the Order of Australia (AM) in the Queen’s Birthday Honours of 2015 in recognition of his significant service to public administration through governance and risk management practices, and to the profession of internal auditing.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Learning Curves: A Bitter buy Undeniable Risk!

Learning Curves: A Bitter buy Undeniable Risk!

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Despite our collective educational establishments that purport to teach so that people can learn, ‘education’ is not necessarily learning.  Mark Twain wrote disparagingly that “Education consists mainly in what we have unlearned” and also that he never let schooling interfere with his own education.  Education is not necessarily knowledge and real learning comes from the application of theory tempered with experience which will make for better decisions and better outcomes.  Benjamin Franklin’s words from over 200 years’ ago “Tell me, I forget. Teach me, I remember. Involve me and I learn” still ring true today.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Anticipatory Leaders Leverage Future Facts (TM)

Anticipatory Leaders Leverage Future Facts (TM)

Guest Post by Daniel Burrus (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

We cannot turn back the clocks and undo the damage the pandemic has done, but we can move forward with an anticipatory mindset and a firm plan of action. For many decades now, and in all industries, digital disruption has been on an exponential curve upward. Because the pandemic forced us to turn to technology for help on both a personal and business level, the pace of technology-driven change increased dramatically, far beyond merely exponential levels. Now that this change has been set in motion, the question remains: What do we do now?

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Victoria’s New Risk Management Framework

Victoria’s New Risk Management Framework

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Enterprise Risk Management (ERM) is considered an important management tool and part of good public sector governance in Australia. The Commonwealth of Australia and the states of Victoria and New South Wales have implemented ERM. In addition, the states of Tasmania and Western Australia have issued good governance frameworks which include risk management.  This piece will provide a historical overview of the risk management approach used by the Australian State of Victoria. It will then discuss the changes made in the 2020 revisions to its 2018 Victorian Government Risk Management Framework.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Career Long Lessons From a Once in a Lifetime Disruption

Career Long Lessons From a Once in a Lifetime Disruption

Guest Post by Daniel Burrus (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

For some, the post-coronavirus “new normal” is a frightening concept that rattles their status quo, while others are taking this moment to seize new opportunities afforded to us by a global disruption, as COVID-19 has proven to be. The fact of the matter is that aforementioned opportunity is available to all of us, whether our “new normal” is unbearably difficult or extremely simple.

You may be asking yourself: How is that possible?

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Annette Davison Ph.D – Future of Work – Risk Management

Annette Davison Ph.D – Future of Work – Risk Management

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Dr. Davison has more than 30 years’ experience in environmental management, integrated water cycle management and risk assessment.  Davison has more than 30 years’ experience in environmental management, integrated water cycle management and risk assessment. She is the Principal Risk Analyst and founding Director of Risk Edge® Pty Ltd. and co-founder and R&D Manager, D2K Information Pty Ltd. She received her PhD in Environmental Biochemistry and Microbiology from Macquarie University. Her most recent book is entitled: The Application of ISO 31000 to Drinking Water Quality Risk Management: A Practical Approach. It is published by Edge Pty Ltd, Sydney Australia.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Project Management Future of Work Risks

Project Management Future of Work Risks

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

What does the future hold for project management?   Remote and flexible work arrangements were trends prior to COVID-19. The pandemic greatly accelerated the trends and a lot of it will be permanent well after the virus is tamed. Remote work arrangement means any work you do that dose not require commuting into an office. A flexible work arrangement are alternate arrangements or schedules from the traditional working day and week. Employees may choose a different work schedule to meet personal or family needs

This paper discusses the risks these changes will have on project management for future work. It does not present new technologies and the risks they will impose on projects. This is a subject for another paper.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

From Quality to Risk: Local Government’s Journey

From Quality to Risk: Local Government’s Journey

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

This piece will examine how the move away from quality management to risk management in United Kingdom local governments developed and how risk management became a mandate. It will then move to the specific by looking at Cheltenham Borough Council’s risk management policy and aspects of the 2018 Audit Committee Annual Risk Management Report. It will close with some observation on where risk and quality management are being used together.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins 1 Comment

Jim Toney – Future of Work – Quality – Interviewed by James Kline

Jim Toney – Future of Work – Quality – Interviewed by James Kline

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

James Toney has more than thirty years of experience in the quality profession. His clients have included the U.S. Department of Labor, IRS, Federal Aviation Administration, U.S. Navy, Housing and Urban Development, Pension Benefit Guaranty Corporation, the Federal Deposit Insurance Corporation, and Health and Human Services. Commercial clients included financial, telecommunications, hospitality, educational, and healthcare organizations.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins 1 Comment

Meeting Procrastination Risk or Productivity Opportunity

Meeting Procrastination Risk or Productivity Opportunity

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

You wait 15 minutes for people to turn up, call-in, or get on-line.  Some may have popped down to Starbucks to get their daily fix of skinny hazelnut caramel latte, or green tea or Evian water.  The punctual few chit-chat away about anything and everything except the meeting agenda in case they commit some anticipatory faux pas.  Then there are those, particularly the decision makers, who let everybody know that they only have a certain amount of time available; they will need to leave promptly so they won’t be late for their next meeting and with all plausible deniability may avoid decisions and conclusions; but wasn’t that the point of the meeting?

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

What is Risk Management?

What is Risk Management?

Guest Post by Andrew Sheves (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Asking ‘what is risk management?’ often gets you the trite answer ‘it’s the management of risk’ or we get a list of activities associated with risk management. Neither result is satisfying and we need a better definition that explains the intent of risk management along with some clarification of what this is and is not. Here, I’ve presented some initial ideas on a definition along with four components that should give us a more thorough definition. 

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Subcontractor Risk is a Major Reason for Project Failures

Subcontractor Risk is a Major Reason for Project Failures

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Studies show that the majority of companies today outsource up to 60-70% of their work scope to subcontractors to stay competitive. As a result, subcontractors are a major source of risk to a project.

How to minimize the subcontractor risk on a project is addressed in this paper. The approach to do this is based on my 30 years of project and project risk management experience and knowledge.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Goldilocks Management: Getting Things ‘Just Right’

Goldilocks Management: Getting Things ‘Just Right’

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

I was once taught that good project management and mitigating the risk of failure was a combination of Fayol’s three pillars of planning, organising and controlling glued together by effective communication and enclosed in a bubble of morale.  I was later to learn that that if one overindulges or ignores any one pillar, or fails to communicate effectively rather than just efficiently, the oftentimes thin bubble of morale may rupture.  The unfortunate result is the loss of management coherence and the real possibility of project failure.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

  • « Previous Page
  • 1
  • …
  • 9
  • 10
  • 11
  • 12
  • 13
  • …
  • 31
  • Next Page »
CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy