Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles / on Maintenance Reliability / Process Plant Reliability Engineering

Process Plant Reliability Engineering

Whilst most reliability literature is concerned with “product” reliability engineering, the described methods (e.g., Weibull analysis and FMEA) find relatively little application in a process plant environment.  At first glance, the reason for this would seem to be the ratio of (many) Assets to (few) Engineers.  However, the real reason is much more interesting.  It is because the traditional methods were developed for application in “simple” and “complicated” systems, whereas a process plant is a “complex” system.  Our response to this situation has been to trivialize the complex system behavior, for example in the form of a risk matrix.  An alternative response would be to apply methods suited for application in complex systems.  For example, simulation is absolutely necessary to make optimal decisions in complex systems.  The aim of this article series is to present concepts, methods, and tools for tackling the reliability engineering problem in the context of a complex stochastic production system.

by Andrew Kelleher Leave a Comment

A New Paradigm for Reliability Engineering

A New Paradigm for Reliability Engineering

We live in turbulent times.  Transformational times.  But what are the possible implications for the production industries and for process plant reliability engineering?

In 2020, Deloitte (Deloitte Touche Tohmatsu Limited) attempted to address the first part of this question by examining four (4) possible scenarios for the future of Europe’s chemical process industry.  The results of their study (refer Figure 1) are relevant for many industries and suggest that “proactive transformation” will be required for a profitable and sustainable future (i.e., Scenario 1).

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Process Plant Reliability Engineering

by Andrew Kelleher 2 Comments

Bridge Theory and Practice with a Phenomenological Asset Model (PAM)

Bridge Theory and Practice with a Phenomenological Asset Model (PAM)

The established tools for process plant reliability engineering are:

  • Asset Criticality Analysis (ACA)
  • Reliability-Centered Maintenance (RCM)
  • Failure Modes and Effects Analysis (FMEA)
  • Risk-Based Inspection (RBI)

QUESTION: Are you truly impressed by the measurable and significant performance increase that these tools have delivered?

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Process Plant Reliability Engineering

by Andrew Kelleher 2 Comments

Why “Big Data” is NOT the Holy Grail for Process Plant Reliability Engineering

Why “Big Data” is NOT the Holy Grail for Process Plant Reliability Engineering

Data is good.  Quality data is better.  “Big data” is even fashionable.  But it won’t help you solve a “small data” problem.

Let me guess.  The quality of your CMMS data is not great, but if it was, you could really do something with it.  Since decades, in fact.  Just need to re-tweak those failure codes!

And recently, you were very tempted by a consultant’s new “data-driven” approach that promised to deliver staggering results.  And why not?

Because it’s not a “big data” problem.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Process Plant Reliability Engineering

by Andrew Kelleher 1 Comment

How to Estimate the Stochastic Performance of your Production System in 5 Minutes

How to Estimate the Stochastic Performance of your Production System in 5 Minutes

“Technical” reliability engineering is “quantitative”.  This implies that the benefits of improvement measures (e.g.: design changes or alternative maintenance strategies) can be quantified in terms of system performance parameters.  Refer, for example, Figure 1.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Process Plant Reliability Engineering

by Andrew Kelleher 5 Comments

Four Reasons to Rethink your Reliability Improvement Journey

Four Reasons to Rethink your Reliability Improvement Journey

The term “reliability improvement journey” is well-established in the chemical process industry. The decade-long, tortuous journey of one company is shown in terms of operational availability (i.e., production) and relative maintenance cost at Figure 1.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Process Plant Reliability Engineering

Headshot of Andrew KelleherArticles by Andrew Kelleher
in the Process Plant Reliability Engineering article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy