Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles / on Maintenance Reliability

on Maintenance Reliability

A listing in reverse chronological order of these article series:



  • Usman Mustafa Syed — Aasan Asset Management series

  • Arun Gowtham — AI & Predictive Maintenance series

  • Miguel Pengel — Asset Management in the Mining Industry series

  • Bryan Christiansen — CMMS and Reliability series

  • James Reyes-Picknell — Conscious Asset series

  • Alex Williams — EAM & CMMS series

  • Nancy Regan — Everday RCM series

  • Karl Burnett — History of Maintenance Management series

  • Mike Sondalini — Life Cycle Asset Management series

  • James Kovacevic — Maintenance and Reliability series

  • Mike Sondalini — Maintenance Management series

  • Mike Sondalini — Plant Maintenance series

  • Andrew Kelleher — Process Plant Reliability Engineering series

  • George Williams and Joe Anderson — The ReliabilityXperience series

  • Doug Plucknette — RCM Blitz series

  • Robert Kalwarowsky — Rob's Reliability Project series

  • Gina Tabasso — The Intelligent Transformer Blog series

  • Tor Idhammar — The People Side of Maintenance series

  • André-Michel Ferrari — The Reliability Mindset series

by James Kovacevic Leave a Comment

Hey, Maintenance Planner! Do You Know What to Report on in Weekly Meetings?

As an Enterprise Maintenance Planner, you manage the backlog, provide a maintenance schedule, liaise with Maintenance and Operations, maintain excellent knowledge of the facility and its equipment, and find ways to optimize productivity. Phew! That’s no small to-do list.

Every day, you’re working hard to:

  1. Keep the backlog as low as possible
  2. Keep downtime to a minimum
  3. Manage an organized working schedule
  4. Successfully communicate updates to Operations and Maintenance
  5. Work towards many other tasks and goals too!

[Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Pay $3k to Keep out of Trouble, or More to Get out of Jail

Pay $3k to Keep out of Trouble, or More to Get out of Jail

Pay $3k now to keep out of trouble or more to get out of jail later. Your plant asset performance is down and you know it. It’s only a matter of time before there is an accident. You need to improve but funds are limited. 

The expert consultants will want to begin with some sort of an assessment. They will identify problems and offer solutions, for a price (likely $50k or more). You can’t afford it. Some consultants might even be former employees. Ask yourself, “if they worked here before, then why didn’t she/he fix what was wrong when they were here?” Consider getting a different consultant but you will still struggle with a big inconvenient truth! [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by George Williams Leave a Comment

Terry and Maura Jun 4th

Terry and Maura Jun 4th

Interview with Terrence O’Hanlon and Maura Abad from Reliabilityweb. Discussion includes the changing landscape of reliability, digitilization, and how Reliabilityweb is adapting to serve their customers.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, ReliabilityXperience

by Bryan Christiansen Leave a Comment

How Can Reliability Engineers Improve Maintenance Management

How Can Reliability Engineers Improve Maintenance Management

Reliability engineers are responsible for keeping equipment or facilities operational, extending their useful lives, and managing maintenance costs by formulating relevant maintenance management policies and programs. They offer guidance to maintenance teams, analyze existing maintenance programs to identify opportunities for improvement. Unlike maintenance supervisors, these professionals rarely engage in the daily execution of maintenance tasks. The roles of reliability engineers span the entire lifecycle of an asset beginning from the design phase, operational stage to disposal. How do reliability engineers influence the gradual improvement of maintenance management in different organizations? [Read more…]

Filed Under: Articles, CMMS and Reliability, on Maintenance Reliability Tagged With: Maintenance program, Reliability engineering

by Robert (Bob) J. Latino Leave a Comment

A Mechanic’s Story: The Human & System’s Contribution

A Mechanic’s Story: The Human & System’s Contribution

In this original post, A Mechanic’s Story: Basic Component Fatigue, we took a detailed journey through the physical side of a shaft failure RCA. We stopped at the physical side of that failure, parallel misalignment. However, stopping at the component level of failure does not constitute a credible and thorough RCA. Actually stopping at this level is more along the lines of a Shallow Cause Analysis (SCA). So let’s explore what makes the difference between a Shallow Cause Analysis and a Root Cause Analysis (RCA).

In the previous post we stopped at parallel misalignment. We will continue drilling from that point down. We ask ‘How could we have had parallel misalignment?’ Our team of subject matter experts (SME) hypothesizes 1) it was either misalignment at installation or 2) it became misaligned during operations. 

[Read more…]

Filed Under: Articles, on Maintenance Reliability, The RCA

by James Kovacevic Leave a Comment

10 Tips for Getting the Most Out of Your Next Maintenance Assessment

Assessments are a key tool for driving sustainable improvements in you Maintenance, Reliability, or Asset Management program.

When you hear the work assessment or audit, does it send shivers down your spine?  Do you envision a week or two of some “expert” digging through your data, processes, and performance, looking to get you in trouble for something you did or didn’t do?

While some audits may be to find issues or wrongdoing, most assessments should be viewed as a key activity to improving your current programs or systems.  These assessments, are used to compare your current program to industry best practices, identifying areas which could be improved.  The assessment typically includes a Recommended Course of Action (RCOA) which highlights what gaps should be focused on first.  So, whether the assessment is driven by corporate, internally or externally, how can you get the most out of a Maintenance assessment? [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

How to Keep the Boss Out of Jail

How to Keep the Boss Out of Jail

Here’s a case where they didn’t know how to keep the boss out of jail! In Jan 2019, a mine tailing dam (the structure used to contain waste from mining operations) collapsed. The video below shows the event. 259 people were confirmed dead and 11 declared missing. Cause – liquefaction – a commonly occurring phenomenon, and one that this particular mine had been warned about. Outcome – fatalities and associated human cost, suspended operations (for a brief period), company reputation, criminal charges (executives and engineering consultants). Risk management is an often neglected part of our job. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by Alex Williams Leave a Comment

There’s More to Maintenance Software Than Work Orders

There’s More to Maintenance Software Than Work Orders

At its core, maintenance software is a tool that allows you to generate and schedule work orders and get the right people to do each job. Maintenance software automates paper processes by enabling people to create requests for maintenance work. Maintenance workers then enter the requests into the computerized maintenance management system software (CMMS), which generates the work orders. However, when it comes to the functions of a CMMS, work order generation is only the tip of the iceberg.

[Read more…]

Filed Under: Articles, EAM & CMMS, on Maintenance Reliability

by George Williams Leave a Comment

Interview with Adrian Messer, Manager of US Operations for UE Systems

Interview with Adrian Messer, Manager of US Operations for UE Systems

We sit down with Adrian Messer to discuss ultrasound and UE Systems new OnTrak system

[Read more…]

Filed Under: Articles, on Maintenance Reliability, ReliabilityXperience

by Doug Plucknette Leave a Comment

The Keys To Successful RCM Implementation

The Keys To Successful RCM Implementation

If you have attended any Maintenance and Reliability conference in the last several years, chances are you have seen a presentation on the struggles of RCM implementation. Most present that over 70% of companies who attempt to get started with Reliability Centered Maintenance fail to implement the recommended mitigating tasks identified in their analysis.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Robert (Bob) J. Latino Leave a Comment

What Happened?

What Happened?

As many of you know, I have been encouraging my LI contacts for years to take me up on my offer to review any pictures they have of failed parts, and we would try and provide them some preliminary feedback. Well, someone finally took us op on the offer and we wanted to share what was learned (we obtained permission to do so providing the company name was not used).

Here was the original inquiry via LI instant messenger along with the pictures:

“Dear Sir, As per your advise, I’m sending you a photo of failed flange bolts. I belief they were failed due to fatigue. Could you please review them and identify/ label their failure mode. After your comments on this photo, I’ll put up a recommendation on my RCA. Looking forward to hear from you. Regards.”

[Read more…]

Filed Under: Articles, on Maintenance Reliability, The RCA

by James Kovacevic Leave a Comment

Building a Recommended Course of Action

How to Translate an Assessment into an Action Plan

An assessment was performed and many opportunities identified, but it has been three months, and nothing has changed.   Does this sound familiar?  As discussed in a previous post, the goal of an assessment is to identify gap to best practices and provide the basis to develop a plan to move forward.   However, many times an assessment is performed, the results put into a binder and put on the shelf (does this sound like your RCM initiative?).
[Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Business Case Estimator Insights

Business Case Estimator Insights

Our business case estimator insights show you both savings and earnings potential for improvements in maintenance and reliability. If you are reading this, you probably think there is some opportunity to improve your operational reliability and maintenance performance. You might want to create a business case for change that you can use to get senior management approval and funding. You are in the right place. We’ve created the tools for you to do that, they are readily accessible and inexpensive (the first step is even free). After a period of isolation and/or skeleton staffing, you can probably see problems that may be more hidden when operating with a full staff. Now is a good time to address those to bring performance up as a part of your “new normal”. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by George Williams Leave a Comment

Interview with Jeff Hay, CEO of RDI Technologies

Interview with Jeff Hay, CEO of RDI Technologies

Quick interview with Jeff Hay, CEO of RDI Technologies.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, ReliabilityXperience

by Robert (Bob) J. Latino Leave a Comment

Is There a Direct Correlation Between Reliability & Safety?

Is There a Direct Correlation Between Reliability & Safety?

“Assumption 1: Safety is increased by increasing system or component reliability. If components or systems do not fail, then accidents will not occur. (p. 7)

This assumption is one of the most pervasive in engineering and other fields. The problem is that it is not true.

Safety is a system property, not a component property, and must be controlled at the system level, not the component level. 

New Assumption 1: High reliability is neither necessary nor sufficient for safety. (p.13)”

These statements were excerpted from Nancy Leveson’s “Engineering a Safer World“. 

This contradicts the common belief there is a direct correlation between Safety and Reliability. I personally, being in the Reliability field for 30+ years, believe there is a correlation between Reliability and Safety. But I would assert that it is not a direct correlation. 

[Read more…]

Filed Under: Articles, on Maintenance Reliability, The RCA

  • « Previous Page
  • 1
  • …
  • 34
  • 35
  • 36
  • 37
  • 38
  • …
  • 90
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Today’s Gremlin – It’ll never work here
  • How a Mission Statement Drives Behavioral Change in Organizations
  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy