Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles / on Maintenance Reliability / Conscious Asset

Conscious Asset

by James Reyes-Picknell 2 Comments

Myth Busting 20: We must follow manufacturer’s recommended maintenance

Myth Busting 20: We must follow manufacturer’s recommended maintenance

Manufacturers always publish recommended maintenance for users of their products. There are a few myths about this maintenance – one is that it will result in reliable operation of the equipment. In some cases it does, but in most, it does not. Why? [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 19: High performing organizations spend too much…

Myth Busting 19: High performing organizations spend too much…

These days everyone seems to be cutting spending. It’s entirely discretionary, so it’s easy to eliminate. But is that a smart move?

But today, times are tough. Trade wars, protectionism, and generally sluggish economies before those were a factor have all contributed to poor corporate performance. Shareholders want more. But can you really cut costs to become profitable? No – of course not, at least not in the long term. Cost cutting, if not done intelligently, is an immediate measure that often ends up reducing capability and / or capacity and leaves the organization weaker than it was before. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 18: There are a lot of savings…

Myth Busting 18: There are a lot of savings…

This one is a HUGE MYTH. Maintenance costs are a direct result of what you do and what you do produces capacity for service delivery or production (depending on your business). Cost is a consequence of your actions, available cash (in a budget) does NOT determine what you will spend. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell 2 Comments

Myth busting 17: For spares, follow the manufacturer’s recommendations

Myth busting 17: For spares, follow the manufacturer’s recommendations

The last article speaks to who should run your storeroom – NOT maintenance. It also leaves us hanging a bit – what should go into the store room to ensure good supply of needed materials, when needed? [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 16: Who should run stores?

Myth Busting 16: Who should run stores?

Perhaps the number one excuse that maintainers use for being unable to get repairs executed in a timely manner is to blame parts and their supply. For the maintenance technician on the tools, it’s a very obvious problem. No parts or materials means that work simply cannot be done without some sort of work-around / jury-rigged solution. The alternative is to get the needed materials as quickly as possible – often incurring substantial premiums on the price of the materials and premium shipping charges. When the parts arrive, usually after some waiting period, all emphasis is on getting the job completed even if it requires overtime effort and costs. This makes compliance to budget a real challenge and invites plenty of queries from accounting, finance and general management about our ability to work within a budget. As fire fighters we are sometimes heroes, but as managers we are failures. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 15: KPIs

Myth Busting 15: KPIs

Many believe that if you can’t measure it, you can’t manage it. That’s just not right. Measurements can only count what is countable – dollars, production numbers, headcounts, timeliness, etc. They can’t count the achievement of objectives unless those objectives are purely numeric in nature. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 14: Integrating systems

Myth Busting 14: Integrating systems

In theory, integrated computer systems enable multiple uses for any single piece of data that is input only once. Data becomes available wherever it needs to be in whatever business process is integrated into the whole. In a sense it is like our brains – information and experience is registered once and available for access whenever needed for any purpose. Integrated systems should make our lives at work easier, but they seldom do that. Integrated business computer systems are very complex and can be very difficult to use. Imagine that they must support many separate business processes and departments, all of whom have different “languages” and ways of doing things. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 13: We need our old data

Myth Busting 13: We need our old data

You’ve acquired and are now implementing a new CMMS / EAM (Computerized Maintenance Management System / Enterprise Asset Management) computer software program to help you manage maintenance. It may be a simple functional system that only looks after maintenance and likely Maintenance, Repair and Operating (MRO) spares, or it may be part of a much bigger enterprise system that handles many business functions. Regardless, one question almost always arises when converting from one to another system – what should we do about our old data? [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell 2 Comments

Myth Busting 12: CMMS is the Silver Bullet

Myth Busting 12: CMMS is the Silver Bullet

Technology provides us with some fantastic tools to help us work better, smarter, faster and more efficiently. BUT, it doesn’t help us think any better. We can actually get too dependent on it and our thinking is weakened. If you don’t believe that, just watch what happens when you try to buy something and the computerized cash register goes down. Can they actually take payment? And if you use cash, can the clerk make proper change without looking at the cash register to tell them how much to give you. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Stop doing too much maintenance

Stop doing too much maintenance

Even if you have excellent planning and scheduling, you may still experience excessive downtime. Some consultants will promise that you’ll save a great deal of money with good P&S simply because planned and scheduled work is less expensive to execute. They are partially right too! But that’s only part of the picture. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 11: Leave Room for Surprises

Myth Busting 11: Leave Room for Surprises

Surprises happen anywhere and to anyone. In your operation, you can expect that regardless of your best efforts, some work will arise that must be done right away. Most would call these emergencies.

To me, an emergency is something that is or is about to have a MAJOR impact on: Safety (i.e.: injury or death), Environment (i.e.: a major incident that is likely to get you fined or shut down), or Production/service delivery (i.e.: irreparable impact on the bottom line in the financial reporting period). [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 10: Shutdown Coming

Myth Busting 10: Shutdown Coming

A lot of people think about this one, but their actions reveal that this myth underlies what they are thinking.

Shutdowns are major undertakings performed when production is at a standstill (zero revenues) and because of the scale of the work being undertaken, costs are at a high point. There is a natural and well-justified desire to minimize the duration and frequency of shutdowns. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 9: Planners do all the planning

Myth Busting 9: Planners do all the planning

This myth, is about who should plan your work and there is plenty of confusion around this one. For the most part, I’d agree that planners should do this, but not all – see below.

First understand that all jobs should be planned and those plans should be saved as “standard jobs” (or whatever you want to call them) in a job plan library. Plans should be written once and then used many times. Each use, subjects the plan to what is happening in the field and therefore each plan is subject to upgrading with each use. Feedback from the trades in the field triggers that continuous improvement loop that keeps plans current and ready for next use. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 8: Who should schedule work

This myth is about who should schedule work.

There are three roles involved here: planners who plan the jobs, supervisors who supervise their crews and schedulers who create the work schedule.

Planning, as stated before, is all about what work gets done and how.

Scheduling is about when the work gets done. The practical constraint is that no work goes on a schedule until you are sure you have everything you need to execute that work when you schedule it. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Myth Busting 7: Planning meetings

This myth, planning meetings are for planning, is based on a misuse/misunderstanding of correct planning and scheduling terminology. Planning meetings are normally run by your planner, but they are not, or shouldn’t be, about planning. They are about scheduling – i.e.: when work will be executed. Planning defines what work (scope) will be done, how to do it (instructions, guidance, specs, etc.) and what is required to do it (resources, skills, permits required, etc.). Scheduling is done to define when the job will be executed and by which resources (skilled trades). [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

  • « Previous Page
  • 1
  • …
  • 6
  • 7
  • 8
  • 9
  • 10
  • …
  • 13
  • Next Page »

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy