Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Archives for Articles / on Maintenance Reliability / Conscious Asset

Conscious Asset

by James Reyes-Picknell Leave a Comment

We want it now and we want it cheap

We want it now and we want it cheap

These days most of us are used to instant gratification – we want it now and we want it cheap! When it comes to information, entertainment, finding your way around, and communications we more or less have it all at our fingertips. It’s also available to us just about anywhere. We can even order and pay for coffee to pick up on our way from the commuter train to the office – no line ups for delays. We can book houses, rooms, hotels, airlines, vacations, and rental cars at the touch of our fingers with apps that show us the cheapest options. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Are you on the right track with the right…

Are you on the right track with the right…

Are we on the right track with the right train? Your job is to improve reliability and you have a plan. It focuses on bad-actors, having the right data, cleaning up some parts data that is known to be causing delays in work execution, a bit of training in reliability methods, and your adding engineers. You are certainly on the right track with your plan and the actions you will take should indeed make some improvement. But are you on the right track? [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Uptime: Choosing Excellence

Uptime: Choosing Excellence

The original edition of Uptime had “process re-engineering” as a 4th level at its pinnacle. It reflected what was then widely regarded as an approach to obtain beneficial change quickly. But, since the 1990’s that approach, was abused and used as a smoke-screen for downsizing or right-sizing as many would prefer to call it. That was never intended by the originators of “Business Process Re-engineering”, but it is what happened. It was lopped off the top of the pyramid in the 2nd edition – process re-design belongs as  a result of strategy, not as a panacea for poorly designed and executed process. Processes should be revisited BEFORE implementation of IT / IM and occasionally it should all be reviewed as part of good governance, just like audits. The fundamental processes of good maintenance management practice are already described in this book’s chapters – how they appear on flow charts or value stream maps is up to each user. The third tier in Uptime (1st edition) was about Continuous Improvement, but it contained methods that were both more fundamental in their importance and more sophisticated than the tweaking that “continuous improvement” implies. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Uptime – Essentials: You need these

Uptime – Essentials: You need these

In the first edition, the second tier of the pyramid was called “control”. Of course the harder we try to control something, the more complex we make things, and the more likely they will go awry. If you have teenage children you can see that very clearly! You want them to learn and mature, but if you try to control how they do it, you will have trouble. Less control, while providing guidelines and advice, and letting them make their choices will work far better. In “Uptime” the emphasis is on successful practice, not control. Control is exercised in how you decide to implement the practices. The practices remain “essential” to your success no matter how you deploy them. The subjects covered in this level of the pyramid have remained much the same throughout all three editions of Uptime but they’ve grown richer in detail, providing more insight, and with emphasis on how tightly integrated they really need to be with each other. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Leadership — Uptime, 3rd edition

Leadership — Uptime, 3rd edition

Leadership

This is the base of the pyramid – its foundation, comprising Strategy, People, and Teams. It includes a few topics: Strategy and People and Teams. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Show me the money!

Show me the money!

Benjamin Franklin’s axiom, “An ounce of prevention is worth a pound of cure”, has been used most commonly when referring to health care. It is also highly appropriate in reliability and maintenance circles.

Of course, we complicate it in business by wanting to know what the prevention will cost and what we save by avoiding the cost of the cure. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Why Do You Let Your Budgets Hold You Back?

Why Do You Let Your Budgets Hold You Back?

The “no brainer” opportunity

Let’s say that you run your own business. You have an opportunity to invest some money and get a payback that is more than your total investment within the first year (payback is more than 100% in the first year). Moreover, that payback will continue for many years. Would you invest?

Most entrepreneurs running their own businesses would say yes. After all, the proposition is a “no brainer”. There aren’t a lot of investments with such huge paybacks. Yet many managers in most larger companies won’t go for it. Why? [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

The Link Between RCM Facilitation and Effective Maintenance

The Link Between RCM Facilitation and Effective Maintenance

These are challenging economic times and opportunities abound with many of our customers to add new business value. They are turning to us and asking: “You’ve brought great value to our Reliability Centered Maintenance (RCM-R) program through knowledge capture, personnel education, laying the foundation for a ‘living’ maintenance program and so on. However, what additional value can you provide us beyond what you have already done?”  One answer: “Focus on writing high-value, asset maintenance tasks. i.e. Tactical PM Program Implementations”. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Increase Productivity and Competitiveness

Increase Productivity and Competitiveness

Contributed by: David A DeCastro (Salvador, Brazil).

In traveling the world in search of excellence in MRO Materials Management (indirect materials / spare parts), I noticed two curious facts. First, even in developed countries, both the industrial companies and providers of ERPs (enterprise management systems) are often technologically quite backwards outside the realm of their product specialization. Secondly, those typically smaller companies or subject matter experts who have developed differentiated technology, tend to keep it as a safe and guarded trade secret, failing to commercialize their brilliance. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Trick Question: Do You Want Value or Low Costs?

Trick Question: Do You Want Value or Low Costs?

If you can’t sell all you can produce, then reducing costs is often the only way to improve margins, but that simplistic accounting perspective is not always the case. Cost control is often thought to be key to attaining profitability but it the case of maintenance it can get you into trouble. Cost control can have a big opportunity cost if you don’t take advantage of the opportunities you have. Consider that what you might really want is greater value – more for less, no just less. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Lean or Industrial Anorexia

Lean or Industrial Anorexia

In 2014, at an IMEC conference organized by the University of Toronto, Art Rice of Maintenance Technology Magazine said that in many cases “Lean is a form of Anorexia”. He was right then, and he is still right today.

When I heard him, I realized that in many cases where I’ve seen attempts at “lean manufacturing” the lean really means “understaffed”. In those cases some of the lean manufacturing tools have been implemented, often with the help of outside expert help but lean results haven’t occurred. The introduction of “lean” in those companies was yet another attempt to cut costs without any deep thought as to what caused the high costs before introducing “lean”. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Do you need Reliability Centered Maintenance (RCM)?

Do you need Reliability Centered Maintenance (RCM)?

Reliability Centered Maintenance (RCM) is without doubt the most effective method to determine your failure management policies, yet it is sometimes seen as an expensive and time consuming endeavor used to produce what some (mistakenly) believe they can get from manufacturer recommendations and other sources. The naysayers see it as a “gold plated” approach to a relatively simple challenge – produce a decent maintenance program.
They couldn’t be more wrong! And that error, could get them into a lot of trouble if circumstances align against them. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Achieve Results Using RCM

Achieve Results Using RCM

In the field, we know that there are no “quick fixes” or “silver bullet solutions” when it comes to improvements in maintenance management. Many separate conditions and events must come together properly to achieve “schedule success” – i.e.: the high level of compliance to a schedule of planned work as produced by your planners. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Maintenance Excellence – no quick fixes

Maintenance Excellence – no quick fixes
We all love instant gratification. Some of us can’t resist temptations, some give in some of the time, others prefer to defer for greater reward later. Never-the-less, regardless of our age, we have grown used to getting what we want, generally quickly and limited only by our ability and willingness to pay for it.

[Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

by James Reyes-Picknell Leave a Comment

Rapid PM Program Deployment

Rapid PM Program Deployment

In the first installment of this series we described the basics behind proactive maintenance and some of the considerations users need to make.

The second installment describes RCM – the “gold standard” for reliability program development and physical asset related risk management. This article is for those who are in “panic” or “fire fighting” mode. If you don’t have a proactive program, equipment runs until it breaks and you can’t seem to get ahead of it, then this one is for you. In a few cases you may have a PM program but your not getting the results you want. You could be overdoing overhauls, not doing enough predictive work, not following up on what you find, or the maintenance actions are simply inappropriate for the failures that occur in your circumstances. [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

  • « Previous Page
  • 1
  • …
  • 4
  • 5
  • 6
  • 7
  • 8
  • …
  • 13
  • Next Page »

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy