Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Capital Asset Management: Setup — part 1

by James Reyes-Picknell Leave a Comment

Capital Asset Management: Setup — part 1

Capital Asset Management: Setup — part 1

Plan to Get Capital Asset Management Right

This is the first of a three part series.

Except for a few industries where mistakes can have high costs in terms of human life or massive environmental impact most of us do a poor job of setting ourselves up for success. We build or acquire new capital assets making little or no provision for spare parts, training of maintainers and operators in new skills and knowledge. Most of us do a very poor job of providing technical documentation to the support disciplines – project engineering often simply files whatever it has gathered and often in a file scheme tied to contractor contract numbers rather than using the asset hierarchy that everyone else will use in one form or another. Commissioning activities rarely push the new assets hard enough – they ramp up slowly, almost gingerly, because so few really know much about how it all should work. They are unprepared for any semblance of normal operations.

Contrast that with the airline industry where new planes are successfully launched, tested and ready for service. When an airline buys its new aircraft it is quick to put it into service on a route where it will be used to its maximum capability. They don’t taxi gingerly down the runway, fly at low altitude and carry half their payload of passengers and luggage. You don’t do that with your new car either – you might put it through a brief “run-in” period where you limit top speed, but you’ll still carry full loads of people, groceries and whatever else you normally carry and even with your speed limit it is set above full highway speeds.

Why do we expect aircraft and cars to operate more or less at full capacity as soon as we take possession while ramping up our plants and factories so slowly?

It’s because we are not ready for them. We’ve done little or nothing to prepare for operations. Spending capital budget on that preparation harms the business case that was used to justify the capital acquisition in the first place so we bury our head in the sand. We leave all that to Opex budgets where they may make modest provisions at best. Those Opex budgets have to be lean or again, the whole business case for the new capital asset is at risk. Again more burying of the head in the sand.

Can we afford to get it right?

I’ve worked on major capital projects where the provision of support was an integral part of the project. We were ready when things started up and we came up to full capacity very rapidly. Everyone knew what to do, we knew what to do if something went wrong, we had the parts, tools, etc. that we could possibly need, we had the proactive maintenance program in place, the systems debugged and working, the skills, knowledge and abilities we needed. What’s more, it wasn’t difficult nor expensive to put all that in place. The cost was on the order of 2 – 3 % of capital cost – far less than the cost of engineering (typically around 10 %) and in line with what companies often pay for warranties.

Considering that warranties usually come with very specific requirements for maintenance or operating practices that are often ignored and invalidating the warranty, then why not spend that money elsewhere? A tailored program for support, including a well-designed maintenance program will usually be different and less expensive than whatever the Original Equipment Manufacturers’ require for warranty compliance.

Designing a proper support program will cost no more than your warranty spend, 2 – 3 % of capital cost and it will deliver benefits for many years. Benefits that can, over the life of the assets add up to amounts that exceed that initial capital cost in its entirety!

What do the best do?

Reliability Centered Maintenance (RCM) was developed in the airline industry for use in the development of reliability programs for new aircraft. It was quickly adopted for use in military, nuclear power and other applications where high reliability is a “must have” and the risks demanded that proactive steps be taken to ensure safety and reliability before systems were put into service. Once they are in service, RCM and other methods are used to ensure that operational systems remain reliable.
Aircraft safety records improved dramatically – more than 120-fold in the years since RCM was developed. Aircraft are delivered ready to work and to do so very safely. The nuclear industry has a similarly impressive track record as does the military with new weapon systems deployment. They all plan ahead and do so very well.

Following on those early examples, RCM has made its way into a wide variety of industries, but the “planning ahead” part that follows from it is often forgotten. In these industries, RCM has usually been applied after plants and equipment enter into service and often in response to disappointment in reliability performance. It is used as a method to correct an intolerable situation.

It would seem that wherever the consequences of failure are largely operational and related only to profit making capability, companies have tended to wait until something goes wrong, or until continued disappointing results are a threat, before taking action. This increases the owners’ risks but it is done in trade-off for a potentially higher short term payback. The savings are up front (less capital spend) and the payback only lasts a short time until the inevitable operational and maintenance problems show up, often not long after commissioning.

CA new book promo


*Accendo Reliability participates in the Amazon Services LLC Associates Program. This affiliate advertising program provides a way for sites to earn a commission on links to Amazon. In short, this means when you buy something on Amazon after following a link from this site, we get a small percentage of its price. This helps support Accendo Reliability by offsetting a portion of the cost to maintain the site. And, your support is much appreciated.

Filed Under: Articles, Conscious Asset Tagged With: Asset management

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« Is Your Maintenance Program Aligned With The Business?
Is This HASS Any Good? »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy