Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Boiler Tube Thermal Fatigue Explained

by Shane Turcott Leave a Comment

Boiler Tube Thermal Fatigue Explained

Boiler Tube Thermal Fatigue Explained

The boiler is the heart of a refinery or power plant. Boiler failures cause forced shutdowns and put the health of the plant at risk. 

Some boiler designs run the risk of thermal fatigue failure. During service, the internal waterside surfaces of the tubes form a thin, protective oxide layer. Yet if the strains caused by the combination of (1) thermal expansion and (2) restraint during temperature fluctuations exceed the oxide strain capacity, the oxide cracks. Each thermal cycle will repeatedly crack the oxide, expose fresh metal when then oxidizes, eventually forming a crack. Technically this mode of cracking is corrosion fatigue-driven by thermal cycling. Yet since the boiler water will always be mildly corrosive, for boiler applications this mode of cracking is simply called “thermal fatigue”.

Above is the site of a power plant boiler tube that had failed by thermal fatigue. You can see that the filled boiler tube is welded into a wall plate. The water filled tube and wall plate which change temperatures and expand/contract at different rates during starts/stops/thermal fluctuations. These differences apply thermal strains on the boiler tube. In this example, the thermal straining on the tube had been so great that the tube had stretched and deformed. 

Note that the mirrored tube appeared to have been replaced at some point in the past, suggesting a history of failures at this site.

Not all thermal cycles would have been so aggressive as to deform the tube. Tube deformation may have been associated with a TRIP or a particularly rough start/stop. Still, this example makes it easy to visualize that this tube had sustained high thermal strains well above that required to break the brittle, protective oxide layer. Thermal cycling (starts/stops/load changes) and the repeated breaking of the oxide layer had eventually resulted in thermal fatigue cracks. Sites that experienced the highest strains, including restrained sites, formed the biggest thermal fatigue cracks.

The definitive identifier of thermal fatigue cracks is their classic wedge, oxide-filled morphology seen by optical microscopy. Thermal fatigue cracks look like what you’d expect, relatively wide cracks filled with oxide. Each loading cycle would break the oxide at the crack tip, exposing fresh metal which corroded until the next thermal cycle. This forms the wide crack base and the tip, which hasn’t had as long to oxidize, is sharper.

In summary, this forty-year old boiler design was susceptible to high thermal strains. The combination of (1) dissimilar thermal expansion between the tube/wall plate and (2) restraint of the wall plate caused the internal oxide layer to crack during thermal cycling. It provides a good example of how some boiler designs are at risk of thermal fatigue cracks.

For boilers with design risks of thermal fatigue, care during operation can help reduce the formation of thermal cracks. Slowly ramping up and down may help increase the life of the boilers. Inspection at such highly strained sites or sites that have suffered thermal fatigue in the past would also help prevent surprises during operation.

Read the full report, link below. Like the article, share with friends. Want to read more, follow.

Filed Under: Articles, Learning from Failures, on Tools & Techniques

About Shane Turcott

Metallurgical engineering supporting reliability efforts by laboratory-based failure analysis. Provides physical evidence as to how and why equipment failed. Author of 'Decoding Mechanical Failures'.

« Fabulous Facilitation: How Do Engaging Exercises Create Remarkable Results?
Functional Groups Indicative Of Reactive Hazards »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Shane Turcott
in the Learning from Failures series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy