Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Benefits of Comparing DMAIC with Project Management

by Robert Allen Leave a Comment

Benefits of Comparing DMAIC with Project Management

Benefits of Comparing DMAIC with Project Management

Our previous article covered the benefits of comparing waterfall with agile, emphasizing the benefit of planning the agile process and product backlog content.  In this article we’ll compare the Define, Measure, Analyze, Improve and Control (DMAIC) thought process, with a project management thought process.

DMAIC is a problem-solving thought process applies critical thinking to ensure robust problem solving.  (See our previous article on the subject here.)  DMAIC is not necessarily a process by which projects are managed, however.  Recall the high-level project management process as follows:

The key overlapping phases are “measure” (in DMAIC) and “plan” (in simplified project management).

Combining the two would simply include a “Measure and Plan” phase, thereby ensuring a robust problem-solving thought process AND a robust project plan.  Recall some of the “plan” phase deliverables that would complement the technical “measure” (of the problem) and business benefit “measure”.

  • Project Plan Checklist – a customized checklist that asks key questions about how the project will be managed, executed, monitored & controlled.
  • Risk Assessment – an ongoing list of risks, scored by severity x likelihood.
  • Action Item List – an ongoing list of actions. Ideally the action item list would include the problem, issue or opportunity, in addition to the corresponding action.  Each action has a person responsible and an action sponsor.
  • Project Schedule – schedule of activities and milestones, ideally in MS Project. Alternatively, a more informal schedule can be established within the action item list.
  • Work Breakdown Structure – define and organize the project work according to a deliverable-oriented breakdown into smaller components (work packages or activities).  For DMAIC, the WBS would include deliverables related to the analytical tool or analysis being planned.

In summary:

Therefore, DMAIC can be more effectively executed using a “measure & plan” phase (or at least require planning to be performed in the measure phase).  Other benefits include training team members in fundamentals of project management, as well as enabling (planned) deliverables to be reviewed and approved in subsequent gate reviews.

Filed Under: Articles, on Leadership & Career, Product Development and Process Improvement Tagged With: DMAIC, Waterfall phase/gate process

About Robert Allen

Robert Allen has over 25 years of professional experience in the areas of product development, process improvement and project management. Rob was a key contributor to numerous deployments of lean sigma and project management organizations, most notably with Honeywell and TE Connectivity. Included in Rob’s experience are multiple certifications and over 25 years of practice in the development, teaching, execution, and leadership of product lifecycle, lean product development, DFSS, lean six sigma, project management, systems engineering and supply chain.

« The Rover Says Good Bye! :(
Dust Bag Selection for Bag-Houses »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Articles by Rob Allen
in the Product Development and Process Improvement series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Join PD&PI

[display_form id=369] Your email is safe and the opt-in here provides your permission to send messages concerning the PD&PI article list plus special announcements. Privacy Policy

Recent Posts

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy