
To maximize the benefits, RCM should be applied as early in the lifecycle as possible, beginning with the design stage. But, most RCM analyses are done on legacy assets – in other words – on assets that are already fielded. And many are initiated decades after the system was fielded – especially in the case of government and military equipment.
Leave a Reply