Refer to Article 7 for the expansion joint project. This project had progressed – perhaps beyond lab testing – before it was realized that the design could not meet ASME LRFD criteria. LRFD was considered necessary for reliability. The engineering manager had to consider a redesign.
Missing the LRFD may be the result of not conducting a design failure modes and effects analysis (dFMEA). FMEA is a risk discovery process. Discovering design risks early in the project improves reliability and increases profitability by avoiding redesign and schedule delays. [Read more…]








Lubrication is often overlooked in organizations. Why it is overlooked, I am unsure. Maybe it is because it is considered to be a basic job, given to the apprentice, or it is just too simple to not to do it correctly.