Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / Agile, Agile 2, and Agility, Part 1

by Greg Hutchins Leave a Comment

Agile, Agile 2, and Agility, Part 1

Agile, Agile 2, and Agility, Part 1

Guest Post by Howard Wiener (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

If you are running a business today using Agile methods, it’s likely that you are not getting the productivity boost from it that you should, and your time to market for new features is probably not what it could be either.

Is that the end of the world?  By and large, yes!  The problem is that your impaired delivery capabilities have a substantial impact on your business agility.  How is that?  Your digital development process is at the center of your product management capability and if you can’t iterate quickly enough it will limit the opportunities for your product managers to redirect the evolution of your products while they’re in development.  When you are in a hurry to get new or updated products to market, they will be less evolved, less marketable and less competitive.

The Strategy-Execution Cycle diagram, below, illustrates the process, interconnections and decision points among the various activities that take place from the time the enterprise identifies an opportunity it would like to pursue (or a threat to which it feels a need to respond) and the time a product makes it into the market.

A common approach to Enterprise Strategy is “where to play/how to win.”  This defines to whom the company will sell its products and services and what those products and services will be.  What is represented in the diagram as the Product Strategy, which may be defined at the level of individual product or a related set of offerings.

The Product Design is defined and iterated on jointly by the Product Management (PM), Product Strategy and Development teams.  It is an embodiment of the Product Strategy that constitutes a starting point from which the product will ultimately emerge after cycles of experimentation and revision, informed by feedback from a number of sources.

The Development team implements each iteration through the Internal Design / Development / Evaluation Loop, contributing ideas to the Product Design along the way.  In this process, the product is built, reviewed, revised and updated iteratively, guided by the PM team.  The Usability Testing bubble in the diagram represents prospective product users (or selected proxies representing their interests) evaluating the evolving product, which informs the path that it will take from that point.

Having been tested in iteration, the evolving product can take one of four paths, three of which are shown in the diagram:

  • It can be cycled back into further development,
  • It can be released for External User Trials; that is, be exposed to a selected set of external users as a trial or ‘beta’ version,
  • It can be sent to Product Release; that is, released for general use. At this point, it may be a Minimum Viable Product (MVP), which is missing key capabilities but is complete enough to allow the company to provide tangible value and gauge customer interest.
  • Or, development of the product can be terminated if it is determined that it does not possess sufficient commercial potential.

In each of the first three cases above, information and feedback is provided to the PM team and upper management, which influences the ongoing evolution of the product.  It’s worth emphasizing that the product’s evolution is never done, even after it is released into the marketplace.  Today’s products exist in a dynamic environment in which others are constantly competing for your market share, and so improvement of your product is never-ending. A product is therefore best thought of as a living thing that must continue to grow and mature—or die.

The green arrows in the diagram indicate where feedback flows into decision-making processes relating to the product:

  • Information from Usability Testing flows back to product design,
  • Information from External User Trials and general users flows back to product strategy and product design and
  • Commercial Performance data flows back to the PM team and everyone else responsible for determining the direction of the product.

Ultimately, your Business Agility depends on how rapidly you can deliver new or updated products into your selected markets. An excessively long development process can constrain your ability to execute your company’s strategic and tactical plans.  The severity of the impact this may have depends on what lines of business you are in and how dynamic your markets are.  Regardless, impairing your business agility will impair your sustainability.  Companies today are living shorter lives than ever, and you need to do whatever you can to survive and thrive.

But why aren’t Agile and DevOps, as most companies have implemented them, creating the acceleration they’re supposed to?   Cliff Berg, Founding Partner of the Agile 2 Academy points out that

“Product development involves People, Processes and Technology.  Common Agile frameworks focus almost entirely on Processes. They ignore the important role of Technology, and while they specify teams and roles, they gloss over or ignore complexities associated with People, how they should collaborate and what kinds of leadership are needed.”

So, cookie-cutter Agile and DevOps adoptions and coaching aren’t going to cut it.  The standardized frameworks and tools they are built on are actually solving the wrong problem and will not help you to achieve the productivity and velocity you need to truly compete in today’s markets.  This is because they provide canned processes to follow, but agility arises in the course of people defining their own process. A canned process defined by someone else will never make your organization agile. This is why Agile 2 was created: to get back to what works, which is to focus on leadership styles and guidance for how to define our own agile processes.

Standard “old” Agile approaches also fail to account for things like data architecture and product design, which the Agile movement unintentionally sidelined.  In all, commercial Agile frameworks are too rigid for today’s requirements and focus on the wrong things.  They can easily lead to a lot of spending on activity of low value and other ills that Agile 2 approaches could help avoid.

In the following article, we will examine how you can address what most traditional Agile frameworks are missing and realize a number of corollary benefits at the same time.

Bio

Howard M. Wiener is a big-picture Enterprise Architect, the (soon to be) published CRC Press author of Agile Enterprise Risk Management, Risk-Based Thinking, Multi-Disciplinary Management and Digital Transformation, educator and speaker. He is CEO of Evolution Path Associates, Inc., a New York consultancy specializing in technology management and business strategy enablement and is currently working on developing services with the Agile 2 Academy. Mr. Wiener holds an MS in Business Management from Carnegie-Mellon University and is a PMI-certified

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety Tagged With: Product development

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Maintenance Planner Performance-Based Job Description 
Acceleration Factors »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy