Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Podcasts
  • Courses
    • Your Courses
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
  • Barringer Process Reliability Introduction Course Landing Page
  • Upcoming Live Events
You are here: Home / Articles / 6 Steps a Maintenance Professional Can Do to Reduce Email

by James Kovacevic Leave a Comment

6 Steps a Maintenance Professional Can Do to Reduce Email

Eliminating the Clutter To Focus On The Important Tasks

EmailA common complaint I hear and experience is as a maintenance professional, our inbox has exploded and grown rapidly with all the daily activities in a plant.  All the emails are perceived to be important, but in reality, they are mostly urgent, or not important and not urgent.

Take a moment and think about how much time you spend reviewing and answer emails.  Even those emails that do not need a response, need time to review and move or delete.  I am guessing you spend at least an hour a day dealing with email.   Now think about what you can do with that hour… you could move the department forward and achieve the department and business goals.

Thankfully there are 6 steps you can implement to reduce the number of emails you receive and reduce the amount of time it takes to manage the remaining email.

Eliminate

The first course of action to reducing the time spent on emails is to eliminate many of the email that doesn’t need to exist.  Also, the notification of new emails needs to be eliminated to allow you to focus on the task(s) at hand.

  1. Do not reply all.  When you click reply to all, and everyone does not need a response you flood other people’s inboxes.  This typically causes some people to respond that don’t need to respond. It also tells everyone that everyone needs to be kept informed and they will copy you on everything.   Only reply all when all people need to be informed.
  2. Ask not to be included in non-urgent & non important emails, and broadcast emails.  These may be reports that are automatically generated, that may have served a purpose at a time, by no longer do.  Or these could be the jokes that arrive in your inbox.  Eliminate as many of these as possible.
  3. Turn off the notification in Outlook (or other email program).  When a new email arrives you get the little envelope symbol on the outlook icon.  Turn that off, so you do not get distracted and lose focus on your current task. It can take up to 20 minutes for a person to refocus on an original task after they are distracted.  This alone will allow you to complete your regular tasks quicker.

Automate

Once the email and email distractions have been reduced, we can leverage technology for our advantage, and automated our responses and managing of email.  There are two main was to automate;

  1. Use rules to move emails automatically.  Available in most email programs, you can setup rules based on virtually anything that will automatically file emails, respond to emails or deleted emails, without your intervention.
  2. Template your responses.  Do you receive the same emails or requests on a regular basis?  Or do you have to send out a report every week with the same email?  If so, take some time to determine what are the 5-10 most common emails you send out and write a response.  Save it as a signature, so when you need to respond using a template, you just pick it from the signature list.

Batch

Our brains are designed to focus on a specific task, and numerous studies have concluded that multi-tasking is not effective.  To address this with emails you need to batch process your emails;

  1. Set 2 or 3 scheduled times a day to review email.  Focus during that time and then leave it.  Do not review or check emails except for this time.  This is why we turned off the email notification in the first step.   It may take a little bit of time for your co-workers to get use to not receiving an immediate response, but your productivity will explode.

By implementing these tactics, you should be able to reduce the amount of time spent on emails, and allow you to focus on being a maintenance professional.  With this time, you can ensure that the right activities are being completing and delivering value to the business.

Only when you are effective and efficient can you move the department and team forward in a sustainable manner.  How much time do you current spend on email?  How much time would you like to spend and what would you do with the extra time?  In the next post, we will discuss how a maintenance professional can reduce the amount of meetings they attend.

I’m James Kovacevic
HIGH PERFORMANCE RELIABILITY
Follow @HPReliability

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« 4 Effective Risk Mitigation Strategies
Understanding FMEA Causes – Part 2 »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series
by James Kovacevic

Never Miss a Weekly Article

[display_form id=14] Your email is safe and the opt-in here provides your permission to send you messages about recently published Maintenance & Reliability articles. Privacy Policy

Recent Articles

  • Gremlins today
  • The Power of Vision in Leadership and Organizational Success
  • 3 Types of MTBF Stories
  • ALT: An in Depth Description
  • Project Email Economics

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy